Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Fort Bend County Mud 152's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Person representing the operator (Si Environmental)
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Fort Bend County Mud 152
Work includes : construction of approx 1.23 mile long concrete pavement boulevard with illuminated roundabout intersection and pedestrian tunnels, storm sewer, water line, wastewater line, and bridge.
Posted Date
Jan 23, 2026
Due Date
Feb 13, 2026
Release: Jan 23, 2026
Fort Bend County Mud 152
Close: Feb 13, 2026
Work includes : construction of approx 1.23 mile long concrete pavement boulevard with illuminated roundabout intersection and pedestrian tunnels, storm sewer, water line, wastewater line, and bridge.
AvailableFort Bend County Mud 152
Work includes 1,027 LF of 12" c900 dr-18 pvc cl 150 water line; 110 LF of 8" c900 dr-18 pvc cl 150 water line; 3 EA fire hydrant assembly, includes 6" gate valve & box, 6" pvc and all appurtenances ; 1,137 LF of osha trench safety system; 600 LF of 24" sdr26 d3404 ps115 pvc sanitary sewer, incl. Pipe & fittings (all depths); 398 LF of 21" sdr26 d3404 ps115 pvc sanitary sewer, incl. Pipe & fittings; 1,028 LF of televise sanitary sewer pipe; 554 LF of 24" polypropylene storm sewer pipe; see attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 16, 2026
Release: Dec 18, 2025
Fort Bend County Mud 152
Close: Jan 16, 2026
Work includes 1,027 LF of 12" c900 dr-18 pvc cl 150 water line; 110 LF of 8" c900 dr-18 pvc cl 150 water line; 3 EA fire hydrant assembly, includes 6" gate valve & box, 6" pvc and all appurtenances ; 1,137 LF of osha trench safety system; 600 LF of 24" sdr26 d3404 ps115 pvc sanitary sewer, incl. Pipe & fittings (all depths); 398 LF of 21" sdr26 d3404 ps115 pvc sanitary sewer, incl. Pipe & fittings; 1,028 LF of televise sanitary sewer pipe; 554 LF of 24" polypropylene storm sewer pipe; see attached file.
Fort Bend County Mud 152
Work includes 1,771 LF of 12" c900 dr-18 pvc cl 150 water line; 154 LF of 8" c900 dr-18 pvc cl 150 water line; 181 LF of 12" c900 dr18 pvc cl 150 - restrained joint water line; 186 LF of 12" c900 dr18 pvc cl 150 - restrained joint water line installed within 20" steel casing; 186 LF of 20" steel casing for 12" c900 dr18 pvc cl 150 restrained joint water line installed by trenchless operations; 2,106 LF of osha trench safety system; televise 3,438 LF of sanitary sewer pipe. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 16, 2026
Release: Dec 18, 2025
Fort Bend County Mud 152
Close: Jan 16, 2026
Work includes 1,771 LF of 12" c900 dr-18 pvc cl 150 water line; 154 LF of 8" c900 dr-18 pvc cl 150 water line; 181 LF of 12" c900 dr18 pvc cl 150 - restrained joint water line; 186 LF of 12" c900 dr18 pvc cl 150 - restrained joint water line installed within 20" steel casing; 186 LF of 20" steel casing for 12" c900 dr18 pvc cl 150 restrained joint water line installed by trenchless operations; 2,106 LF of osha trench safety system; televise 3,438 LF of sanitary sewer pipe. See attached file.