Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Floyd County School District
The Floyd County Board of Education is soliciting bids to replace the existing synthetic turf football field at Betsy Layne High School in Stanville, Kentucky. The project includes site improvements and new football equipment such as field goals, wall pads, and associated field hardware. The solicitation posted March 25, 2026, with bids due by April 15, 2026.
Posted Date
Mar 25, 2026
Due Date
Apr 15, 2026
Release: Mar 25, 2026
Floyd County School District
Close: Apr 15, 2026
The Floyd County Board of Education is soliciting bids to replace the existing synthetic turf football field at Betsy Layne High School in Stanville, Kentucky. The project includes site improvements and new football equipment such as field goals, wall pads, and associated field hardware. The solicitation posted March 25, 2026, with bids due by April 15, 2026.
AvailableFloyd County School District
Project is a renovation of the existing Gymnasium. Scope will include selective demolition, sprayed-in-place thermal insulation and sprayed-on acoustical insulation on the interior side of the geodesic dome roof (a new roof membrane on the exterior side was recently replaced). Existing glazing to be replaced with a new translucent panel system. New wood athletic flooring and retractable bleachers will be provided. Improvements to a Band room include new partitions, doors, flooring, storage, and ceilings. New gas water heater will be installed in place of existing. New Packaged air conditioning units and split system will be installed in place of existing HVAC systems. New electrical will be installed to support new HVAC equipment. Demolition and new installation of electrical panels and distribution panel. New sound system will be installed to replace existing and will integrate with video screen.
Posted Date
-
Due Date
Oct 15, 2025
Floyd County School District
Close: Oct 15, 2025
Project is a renovation of the existing Gymnasium. Scope will include selective demolition, sprayed-in-place thermal insulation and sprayed-on acoustical insulation on the interior side of the geodesic dome roof (a new roof membrane on the exterior side was recently replaced). Existing glazing to be replaced with a new translucent panel system. New wood athletic flooring and retractable bleachers will be provided. Improvements to a Band room include new partitions, doors, flooring, storage, and ceilings. New gas water heater will be installed in place of existing. New Packaged air conditioning units and split system will be installed in place of existing HVAC systems. New electrical will be installed to support new HVAC equipment. Demolition and new installation of electrical panels and distribution panel. New sound system will be installed to replace existing and will integrate with video screen.
Floyd County School District
Project consists to sand the floor, removing all existing finish and paint, seal the floor, apply graphics to match the approved mockup, then apply 2 coats of finish.
Posted Date
Jul 31, 2024
Due Date
Aug 21, 2024
Release: Jul 31, 2024
Floyd County School District
Close: Aug 21, 2024
Project consists to sand the floor, removing all existing finish and paint, seal the floor, apply graphics to match the approved mockup, then apply 2 coats of finish.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Skip. The district avoids sole source; redirect to KVEC instead of a district ITB.
Coops: Lead with KVEC. Confirm your item is on a KVEC contract and route the purchase through KVEC for fastest approval.
Entity: Floyd County School District, KY.
No evidence of sole source contracts; the district adheres to competitive bidding. Practical notes: the district’s direct ITB process includes high vendor barriers (surety bonds, employee drug testing plans) and multi-tiered approval thresholds ($40,000 state law, $30,000 district policy). Recommendation: redirect opportunities to KVEC for pre-competed pricing and faster approval.
Board meetings and strategic plans from Floyd County School District
This document outlines a District Improvement Plan for the 2022-2023 academic year. It includes a Continuous Improvement Diagnostic, Executive Summary, Needs Assessment Diagnostic, District Assurances, a Comprehensive District Improvement Plan, Superintendent Gap Assurances, and a Professional Development Plan, all designed to guide and support district-wide improvements.
The school improvement plan focuses on improving student performance in reading, mathematics, science, social studies, and writing. The plan addresses achievement gaps, English learner progress, and the quality of school climate and safety. The plan includes strategies such as curriculum assessment, professional development, and data analysis to monitor student progress and adjust instruction.
The Floyd County Board of Education held a special called meeting to consider and adopt a tentative budget for the 2010-2011 school year. The tentative budget included estimates of anticipated revenues and expenditures based on current staffing, contractual costs, plant operation and maintenance, information from the Kentucky Department of Education, SBDM allocations, funding awards, property tax revenues, and a contingency.
The meeting addressed various topics including student achievements, community comments, and reports on student learning and support. Key actions included approving a MOA agreement for the "Race to the Top" initiative, personnel actions (hirings, transfers, retirements, and leaves of absence), and various financial matters such as bill payments and budget revisions. The board also considered and approved several contracts, facility requests, and student trip requests, along with the rejection and rebidding of certain contracts. An executive session was held to discuss litigation, property, personnel, and expulsions.
The meeting addressed student learning, including attendance reports and make-up time for the 2009-2010 school year, and the approval of the 2010-2011 school calendar. Student support was discussed, including a superintendent's report and utility report for Osborne Elementary School. Numerous consent agenda items were considered, including payments of bills and claims, personnel actions (leaves of absence, retirements, hirings, transfers, and resignations), advertising for sealed bids for various supplies and services, and approval of several student trips. An executive session was held to discuss litigation, property, personnel, and expulsions.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Floyd County School District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database