Robert 'Bob' Lane, Jr. Regional Park Phase 2
Aug 8, 2026
Closes
Aug 26, 2026
Work include 863 CY onsite mass grading; 240 CY import material; 110 LF 12" drainage pipe; 2 EA flat headwall; 2 EA winged headwall; 10 EA concrete wheel stops; 133 LF wooden guardrail; 2,080 SF pavilion walkway / concrete area; 162 SF bench pads (concrete); 116 LF handrail at pavilion; 670 LF fitness station edging; 70 CY fitness station mulch; 93 EA riparian trees- 1" cal; 2,143 SY turf seeding; 143 LF 15" drainage pipe; 30 LF 36" drainage pipe; 3,755 SY turf seeding.