Design Build Services - Englewood Fire Stations
Posted
Nov 9, 2026
Dec 14, 2026
The Fire District, acting through its Board of Fire Commissioners, intends to award a single contract to one qualified Design-Build Team (DBT) for the design and construction of two fire stations. Both fire station projects will be included under the same contract and awarded to the same DBT. However, the District may authorize the projects concurrently, sequentially, or at different times based on funding, permitting, operational needs, site readiness, and other considerations. The award of this contract does not represent a commitment by the District to construct both fire stations simultaneously. The selected DBT will be responsible for providing all design-build services necessary for the complete delivery of both fire station projects. Services include, but are not limited to, planning, design, coordination of district reviews and approvals, permitting, construction, start-up, testing, commissioning, and project closeout. For each fire station authorized by the district, the DBT’s responsibilities will include all investigations, engineering, permitting, coordination, and construction services necessary for complete site development and facility delivery. These responsibilities include, but are not limited to: • Geotechnical investigations; • Construction surveying; • Environmental and hazardous material assessments; • Subsurface-condition investigations; • Utility coordination and connections; • Stormwater design and permitting; • FDOT and other transportation-related permitting, including intersections, turn lanes, signal warrants, and signal design, as applicable; • Site and civil engineering; • Equipment selection, coordination, installation, and commissioning for Contractor-furnished, Contractor-installed equipment; • Coordination, handling, and installation of owner-furnished, contractor-installed equipment; • Coordination of owner-furnished, owner-installed equipment; and • Coordination of equipment, systems, and facility activation. The district may issue separate notices to proceed, authorizations, or project phases for each fire station. The DBT shall plan and manage its personnel, consultants, subcontractors, design activities, permitting efforts, procurement, and construction resources to accommodate the District’s selected timing and sequencing for each project.




