9 Mile Road GAC Tanks & Piping
Posted
Sep 3, 2026
Oct 6, 2026
Installation of stainless-steel piping, fittings, and appurtenances for GAC vessel filtering system.
Track open bid opportunities, contracts, public meetings, and key contacts for Emerald Coast Utilities Authority.
Share your ICP and we will surface 10 ready-to-buy accounts using buying signals, competitor contracts, and procurement activity for free
See my top accountsActive opportunities open for bidding
Posted
Sep 3, 2026
Oct 6, 2026
Installation of stainless-steel piping, fittings, and appurtenances for GAC vessel filtering system.
Posted
Aug 31, 2026
Sep 24, 2026
Emerald Coast Utilities Authority (ECUA) is requesting qualifications from professional consulting firms for the Effluent Management System in Escambia County, Florida. The anticipated services cover design and plans production, bidding and contract-management assistance, construction administration and inspection, and certification and record-drawing preparation through project closeout. Responses are due September 24, 2026, and the procurement is an open qualifications solicitation rather than a grant program.
Posted
Sep 3, 2026
Oct 6, 2026
Rehabilitation of the existing Twin Spires pumping station, as well as demolition and connectivity piping required to transfer the pumping station to the Emerald Coast Utilities Authority. Key components include 200 SY solid sod; 200 SY grassing and mulching, 150 LF silt fence, manhole installation (> 10 VF deep); 2,100 SF FDOT #57 gravel; 1,850 SF aggregate driveway; 230 SF concrete driveway connection; 2" water line service connection; and 4 EA bollards.
Key metrics and characteristics
City
The city where this buyer is located.
Pensacola
County
The county where this buyer is located.
Escambia
Address
Physical address of this buyer.
9255 Sturdevant St
Phone Number
Contact phone number for this buyer.
(850) 476-0480
Zip Code
Postal code for this buyer's location.
32514
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
Startup Friendliness
How often this buyer champions startups and early adoption.
Latest Budget Year
Unlock to view
Operating Budget
Unlock to view
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
AI-ranked best-fit opportunities before bid boards
Auto-drafted, compliance-ready outlines & boilerplate
Track vendor wins and renewal opportunities
This agreement details an application for an irrigation meter, specifying that the water is solely for irrigation and must not be discharged into the sewage system to avoid additional fees. It also informs the applicant of potential extra connection fees due to Florida Department of Transportation (FDOT) road work requirements for connections to ECUA water/sewer on State roads.
See expiring contracts, renewal timing, pricing history, and competitor awards, then sync the data to your CRM.
Board meetings and strategic plans from Emerald Coast Utilities Authority
The board discussed several items, including an update on the closing of Santa Rosa Sound after the Blue Angel Air Show, a progress report on backflow preventers, and the McCorvy water treatment plant timeline. General resolutions were passed, including the authorization for an engineering service proposal from HDR Engineering, Inc. for the replacement of a water treatment facility at the Haggler well using PFAS settlement funds, an extension of the contract with Calgon Carbon Corporation for carbon media supply, and a renewal of the electric motor and pump repair agreement with Gulf Coast Electric Motor. Staff clarified that while the requirement for backflow preventers was part of a consent order, they are actively seeking solutions and pausing enforcement regarding water disconnection.
The board meeting included the recognition of recycling program supporters and the adoption of multiple resolutions. These resolutions covered various infrastructure and operational needs, such as engineering service proposals for treatment facilities, contract extensions for water treatment chemicals, equipment purchases for water reclamation facilities, and ground maintenance contracts. The board also ratified an emergency water main extension, authorized the inventory purchase of water meters, and approved comprehensive insurance renewal agreements for employees while absorbing medical premium cost increases.
Public-sector contacts connected to Emerald Coast Utilities Authority.
Get relevant Emerald Coast Utilities Authority bid alerts
Track Emerald Coast Utilities Authority bids, renewals, public meetings, and contact changes matched to what you sell.
Competitor & pricing intel from past awards
Native sync to Salesforce & HubSpot
Expiring contracts, renewals, and award history
Competitor contract data and source files
Budget and spend signals to prioritize accounts
Native sync to Salesforce and HubSpot
The Board meeting included discussions on several key operational and policy topics. A presentation was provided on the ECUA Five-Year Strategic Business Plan, covering goals, financial viability, and infrastructure objectives. Public forum participants addressed legislative developments related to water fluoridation and concerns regarding sewer infrastructure expansion in the Old Warrington neighborhood. The Board reviewed the Citizens' Advisory Committee report, which included recommendations for utility service agreements and project fund transfers. Special resolutions were adopted to amend the ECUA Code regarding weather-related service adjustments, personnel policies, and purchasing procedures. Additionally, the Board authorized the purchase of sanitation cans, approved an interlocal agreement for engineering services, and finalized a change order for the Pensacola Beach reclaimed water line project. The session concluded with a review of the budget and a status update on IT project initiatives.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Emerald Coast Utilities Authority meetings, strategic plans, and budget discussions before the public bid appears.
Early signals from meeting minutes and plans
Vendor mentions and competitor tracking
Decision timeline from discussion to RFP
Quotable insights from buyer leadership