Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
East Cherry Creek Valley Water And Sanitation District
Works include approx. 94 SY asphalt pavement; 1 LS Well Decommissioning: WD-4; 1 LS hydrant installation; 1 LS Well Decommissioning: WD-5.
Posted Date
Jun 11, 2026
Due Date
Jul 10, 2026
Release: Jun 11, 2026
East Cherry Creek Valley Water And Sanitation District
Close: Jul 10, 2026
Works include approx. 94 SY asphalt pavement; 1 LS Well Decommissioning: WD-4; 1 LS hydrant installation; 1 LS Well Decommissioning: WD-5.
AvailableEast Cherry Creek Valley Water And Sanitation District
Well A-30 was drilled in the spring of 2026 as a replacement for well A-15, which will be decommissioned in 2026. The mechanical, electrical, and chemical systems will be housed inside a modular prefabricated building. The project includes installation of yard piping and a gravel access drive to the building from a new access gate, including accommodations for chemical delivery and maintenance personnel.
Posted Date
Apr 30, 2026
Due Date
Jun 5, 2026
Release: Apr 30, 2026
East Cherry Creek Valley Water And Sanitation District
Close: Jun 5, 2026
Well A-30 was drilled in the spring of 2026 as a replacement for well A-15, which will be decommissioned in 2026. The mechanical, electrical, and chemical systems will be housed inside a modular prefabricated building. The project includes installation of yard piping and a gravel access drive to the building from a new access gate, including accommodations for chemical delivery and maintenance personnel.
East Cherry Creek Valley Water And Sanitation District
Work consists of erosion repair and reconstruction of the overflow channel. Construction activities will include regrading, soil and rock placement per design plans, berm reconstruction, erosion control measures, and revegetation of disturbed areas.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
East Cherry Creek Valley Water And Sanitation District
Close: Jan 8, 2026
Work consists of erosion repair and reconstruction of the overflow channel. Construction activities will include regrading, soil and rock placement per design plans, berm reconstruction, erosion control measures, and revegetation of disturbed areas.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from East Cherry Creek Valley Water And Sanitation District
The 2025 Water Conservation Plan for the East Cherry Creek Valley Water & Sanitation District assesses current and future water use, raw water supply, and treatment capacity. The plan outlines conservation and efficiency measures across operational utility aspects, water loss control, public education, indoor residential use, outdoor landscapes and irrigation, and water reuse systems. It forecasts significant water savings and associated financial benefits, emphasizing sustainable and efficient water resource management.
Extracted from official board minutes, strategic plans, and video transcripts.
Track East Cherry Creek Valley Water And Sanitation District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge