Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Earnhart Hill Regional Water And Sewer District
The structure is a 200,000 gallon toroellipse with a low-water level of 88 ft. 9 in. and a head range of 28 ft. 3 in. The work includes Exterior: High-pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system. Foundation: Water clean and apply a two (2) coat epoxy system. Repairs: 1) Replace the riser manway gasket. 2) Install a gasket on the wet interior roof hatch. 3) Overflow discharge modification. 4) Replace the fall prevention device on the wet interior ladder. 5) Install a vandal guard. 6) Balcony drain holes. 7) Install swing gates at the balcony opening and at the step-off platform opening. 8) Trim the leg ladder. 9) Install grounding rods for the structure.
Posted Date
Mar 13, 2026
Due Date
Apr 6, 2026
Release: Mar 13, 2026
Earnhart Hill Regional Water And Sewer District
Close: Apr 6, 2026
The structure is a 200,000 gallon toroellipse with a low-water level of 88 ft. 9 in. and a head range of 28 ft. 3 in. The work includes Exterior: High-pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system. Foundation: Water clean and apply a two (2) coat epoxy system. Repairs: 1) Replace the riser manway gasket. 2) Install a gasket on the wet interior roof hatch. 3) Overflow discharge modification. 4) Replace the fall prevention device on the wet interior ladder. 5) Install a vandal guard. 6) Balcony drain holes. 7) Install swing gates at the balcony opening and at the step-off platform opening. 8) Trim the leg ladder. 9) Install grounding rods for the structure.
AvailableEarnhart Hill Regional Water And Sewer District
The project consists of, but not limited to, installing approx. 2500 LF of 8” waterline along Bolender Pontius Road. Method of installation shall be per open cut and/or HDD (Horizontal Directional Drilling) methods. Also included are approx. 16 service reconnections and miscellaneous appurtenances.
Posted Date
Jan 24, 2026
Due Date
Feb 6, 2026
Release: Jan 24, 2026
Earnhart Hill Regional Water And Sewer District
Close: Feb 6, 2026
The project consists of, but not limited to, installing approx. 2500 LF of 8” waterline along Bolender Pontius Road. Method of installation shall be per open cut and/or HDD (Horizontal Directional Drilling) methods. Also included are approx. 16 service reconnections and miscellaneous appurtenances.
Earnhart Hill Regional Water And Sewer District
Supply of bulk water softener salt.
Posted Date
Oct 4, 2025
Due Date
Oct 27, 2025
Release: Oct 4, 2025
Earnhart Hill Regional Water And Sewer District
Close: Oct 27, 2025
Supply of bulk water softener salt.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Earnhart Hill Regional Water And Sewer District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database