Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Dutchess County Water and Wastewater Authority
Provide maintenance of the hvac equipment located at five (5) locations.
Posted Date
Jul 21, 2026
Due Date
Aug 11, 2026
Release: Jul 21, 2026
Dutchess County Water and Wastewater Authority
Close: Aug 11, 2026
Provide maintenance of the hvac equipment located at five (5) locations.
AvailableDutchess County Water and Wastewater Authority
Annual contract to remove and dispose of brine from the shore haven facility.
Posted Date
Jul 20, 2026
Due Date
Aug 13, 2026
Release: Jul 20, 2026
Dutchess County Water and Wastewater Authority
Close: Aug 13, 2026
Annual contract to remove and dispose of brine from the shore haven facility.
AvailableDutchess County Water and Wastewater Authority
Work will generally consist of extending water service by constructing a new 8" water main includes traffic control; 110 CY rock excavation; 25 CY excavation beyond normal depth - unsuitable material; 10 CY controlled density fill; erosion and sedimentation control; 1,400 lf 8" HDPE water main & fittings; 90 LF of 12" HDPE water main & fittings; 3 EA 8" gate valves with boxes; 12" gate valves with boxes; 3 EA hydrant assemblies; 20 LF 1" copper tubing for water service; 1 EA 1" water service corporation; 1 EA 1" water service curb stop, box & coupling; 560 sy temporary bituminous concrete trench repairs; 390 SY permanent bituminous concrete trench repairs - town; 120 SY permanent bituminous concrete trench repairs - driveway. See attached file.
Posted Date
Jun 22, 2026
Due Date
Jul 23, 2026
Release: Jun 22, 2026
Dutchess County Water and Wastewater Authority
Close: Jul 23, 2026
Work will generally consist of extending water service by constructing a new 8" water main includes traffic control; 110 CY rock excavation; 25 CY excavation beyond normal depth - unsuitable material; 10 CY controlled density fill; erosion and sedimentation control; 1,400 lf 8" HDPE water main & fittings; 90 LF of 12" HDPE water main & fittings; 3 EA 8" gate valves with boxes; 12" gate valves with boxes; 3 EA hydrant assemblies; 20 LF 1" copper tubing for water service; 1 EA 1" water service corporation; 1 EA 1" water service curb stop, box & coupling; 560 sy temporary bituminous concrete trench repairs; 390 SY permanent bituminous concrete trench repairs - town; 120 SY permanent bituminous concrete trench repairs - driveway. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge