Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
District Energy Corporation
Installation of a multistack upgrade reversing valve. Bidder shall provide all labor, materials, equipment, and supervision necessary to: Install twenty (20) current-version OEM reversing valve upgrade kits in the two (2) heat pump units identified above: Five (5) Side A reversing valves (OEM part number VALVEKITMR70XA) per Heat Pump unit (10 total); Five (5) Side B reversing valves (OEM part number VALVEKITMR70XB) per Heat Pump unit (10 total); see attached file.
Posted Date
Jun 15, 2026
Due Date
Jun 30, 2026
Release: Jun 15, 2026
District Energy Corporation
Close: Jun 30, 2026
Installation of a multistack upgrade reversing valve. Bidder shall provide all labor, materials, equipment, and supervision necessary to: Install twenty (20) current-version OEM reversing valve upgrade kits in the two (2) heat pump units identified above: Five (5) Side A reversing valves (OEM part number VALVEKITMR70XA) per Heat Pump unit (10 total); Five (5) Side B reversing valves (OEM part number VALVEKITMR70XB) per Heat Pump unit (10 total); see attached file.
AvailableDistrict Energy Corporation
Purchase fuel oil filter skid.
Posted Date
Jan 14, 2026
Due Date
Feb 5, 2026
Release: Jan 14, 2026
District Energy Corporation
Close: Feb 5, 2026
Purchase fuel oil filter skid.
District Energy Corporation
The work consists of dry cooler & heat exchanger installation. Further includes sitework: minor grading for new structural concrete support pad for fluid cooler unit and associated pipe supports, removal of turf areas disturbed by construction activities, miscellaneous surface features, and related construction items; core drilling of existing insulated precast concrete wall panels for new pipe and conduit penetrations. Mechanical, Electrical, and Plumbing. See outside link.
Posted Date
Feb 7, 2025
Due Date
Mar 4, 2025
Release: Feb 7, 2025
District Energy Corporation
Close: Mar 4, 2025
The work consists of dry cooler & heat exchanger installation. Further includes sitework: minor grading for new structural concrete support pad for fluid cooler unit and associated pipe supports, removal of turf areas disturbed by construction activities, miscellaneous surface features, and related construction items; core drilling of existing insulated precast concrete wall panels for new pipe and conduit penetrations. Mechanical, Electrical, and Plumbing. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge