Creek Bank Stabilization - 2121 Alameda Diablo Project
Apr 13, 2026
Closes
Aug 25, 2026
Project is the further stabilization of an emergency creek bank repair. The permanent embankment repair consists of stabilizing the existing riprap with a high-tensile steel wire-mesh facing (6-inch openings) connected to soil nails anchored in native material behind the riprap.
