CountyNC
Jul 23, 2026
Closes
Sep 1, 2026
Dillingham Creek Bank Stabilization (Request for Proposals)
Seeks proposals for the stabilization of a portion of Dillingham Creek in Barnardsville.
Description: Project is the further stabilization of an emergency creek bank repair. The permanent embankment repair consists of stabilizing the existing riprap with a high-tensile steel wire-mesh facing (6-inch openings) connected to soil nails anchored in native material behind the riprap.
SpecialDistrict · CA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CountyNC
Jul 23, 2026
Closes
Sep 1, 2026
Seeks proposals for the stabilization of a portion of Dillingham Creek in Barnardsville.
CountyGA
Jul 29, 2026
Closes
Aug 27, 2026
Work inlcudes 22 EA micro piles; 1 LS pre-cast boardwalk installation (beams,treads, abutments, harware); 285 LF handrail - 42" aluminum w/wire mesh (boardwalk); 10 tn asphalt base 4"thick 25mmsp; 5 TN asphalt topping 2" thick 9. 5mmsp; 5 tn landscape gravel; 1 EA construct maintain and remove construction exit; 200 LF orange barrier fence (as directed by engineer), to incl install, maint and removal; 1,650 LF install maintain and remove temporary silt fence type c; 500 SY temporary grassing(incl mulch,seed,and all other items. See attached file.
U.S. Army Engineer District Mobile
FederalAL
Aug 12, 2026
Closes
Sep 2, 2026
Design and construct a flood risk management and bank stabilization project.
Jul 29, 2026
Closes
Aug 28, 2026
Constructing three 3 grade control structures. Work for the grade control structures include clearing and grubbing; excavation, backfill, embankment, control of water; storm water pollution prevention; and environmental protection.