FEMA R1 Mini-Split System Install - (Request for Quote)
Jul 29, 2026
Closes
Aug 13, 2026
Electrical: Powering line voltage from panel R-2-2; Contractor to calculate, verify sizing amps and electrical capacity for wire gauge and breaker size for approximately 200 feet dedicated circuit; Confirm wall/ceiling structure use independent mounting supports; Install dedicated breakers and wiring from panel to outdoor unit. See attached file.
