Replace Boiler Stack Rome CBOC RFP
Posted
Nov 3, 2026
Dec 2, 2026
Provide demolish two (2) existing boiler exhaust stacks and one (1) generator steam relief stack and demolish the concrete / masonry chimney structure and seal the existing roof and construct and install two (2) new steel boiler exhaust stacks, the steel support structure, and one (1) steel generator exhaust pipe. See attached file.


