Water Pump Replacement
Posted
-
Nov 30, 2026
Cassadaga Job Corps Center seeks a subcontractor to replace its pump-house water pumps with a booster pump system. The work includes removing existing end-suction centrifugal pumps and related check valves and installing two booster pumps with variable-speed drives. Requirements also include automatic tower fill valves, a hydropneumatic expansion tank, copper piping and fittings, fiberglass pipe insulation, final testing, and factory startup.


