DeFo - Hickory Lane Street Reconstruction & Linde Lane Road Realignment
Aug 25, 2026
Closes
Sep 8, 2026
Work includes clearing and grubbing; 8,200 SY of pulverize existing asphalt; common excavation; 300 LF of shouldering; 300 LF of sawcut asphalt; 14,000 SY of 2" 4 MT 58-28S HMA pavement; 14,000 SY of asphaltic tack coat; 3,400 LF of 4" pavement markings; 1 EA of street sign; 14,900 SY of erosion mat DOT Class 1 type A w/ seed and fertilizer; 2,200 LF of silt fence; 5,600 LF of 30" concrete curb and gutter; 9,000 SF of 4" concrete sidewalk; 50 EA of truncated dome; 800 LF of electrical wire lighting 12 AWG; 4 EA of manhole adjustment with rings; 60 LF of 6" C-900 watermain; 598 LF of 12" HDPE storm sewer; 73 LF of 30" RCP storm sewer; 50 LF of 6" PVC storm sewer; 8 EA of 48" storm sewer manhole; 533 LF of 8" PVC SDR-35 Sanitary sewer;