Natural Gas Facilities Relocation, Section 1 RFP
Posted
Nov 19, 2026
Dec 10, 2026
Work inlcudes 906 LF 8" steel pipe (open trench); 1,320 LF 2" pe pipe; 1 EA 8" hot-tap connection (line stopper fitting); 1 EA 2" pe to 2" pe connections; 1 EA 2" pe to 1-1/4" connections; 1 EA cathodic test station and other miscellaneous necessary items.