IFB26-C4: Richmond Street Complete Streets Project
Posted
Sep 2, 2026
Sep 24, 2026
Contra Costa Transportation Authority is soliciting bids under IFB26-C4 for the Richmond Street Complete Streets Project. The construction scope includes full-depth pavement reclamation, asphalt milling and filling, Class II bicycle-lane striping, sidewalk and accessible curb-ramp work, solar-powered RRFBs and street lights, traffic calming, landscaping and tree planting, and signal modifications. The opportunity was posted on September 2, 2026 at 11:36 PM and is marked open with bids due September 24, 2026 at 12:00 PM; although related project materials note SS4A funding, this is an IFB for construction rather than a grant-program solicitation.
