Work consists of installing new electric service to the R.O. Site and well site, including new electrical service, metering disconnects, transfer switches, generators, panels, and docking stations to feed existing equipment and power new hvac units. The project also includes extending power from the well site to a nearby above-ground storage tank for lighting and instrumentation power. Electrical will include low-voltage wiring in duct bank systems via pull boxes, cable testing, trenching, and backfill. The existing sites must remain operational utilizing existing temporary generators until new service and equipment have been installed, tested, commissioned, and switched over. New equipment foundations, slabs, and supports will be required as shown on the drawings and described in the specifications, or as otherwise required for a first-class operating facility.
Public records
Mentioned in public records
Public documents that mention Veronica Garcia.
Sep 9, 2026·Board meeting
Public Service Board City of El Paso Meeting Minutes
The Board engaged in multiple actions during two meetings. Key activities included approving various contracts and agreements for water treatment chemicals, construction services, and technology integration. The Board also addressed personnel matters, discussed real estate transactions and acquisitions, and reviewed emergency agreements related to wastewater treatment operations. Additionally, the Board conducted a budget workshop to discuss the FY2027-2028 operating and capital improvement budgets, focusing on infrastructure needs, financial challenges, affordability measures, and project priorities for water, wastewater, and stormwater systems.
Enterprise
Get verified public-sector contacts at scale
Find verified emails, direct dials, role context, job-change updates, and organization signals across every public-sector account you sell to.
The board discussed an agenda item regarding increasing the capacity of an existing master contract issued to PC Automated Controls, Inc. for maintenance, repair, and operation services. The proposal sought to add $1,000,000 to the current contract amount, bringing the cumulative total to $1,500,000, utilizing the ESC Region 19 Cooperative Contract purchasing method.
Aug 12, 2026·Board meeting
Public Service Board City Of El Paso Regular Meeting Minutes
The board approved several key operational items, including grant applications for water reclamation projects, a sole source agreement for wastewater monitoring, and capacity increases for existing maintenance and operations contracts. Multiple professional engineering services contracts and change orders for ongoing infrastructure projects were awarded. The board also approved awards for government relations services, technical grade methanol supply, and sludge disposal services. Significant construction-related approvals included a preconstruction services contract for Northeast utility improvements and a Guaranteed Maximum Price amendment for the Roberto Bustamante Wastewater Treatment Plant expansion. Additionally, the board adopted amendments to the investment policy, accepted the annual comprehensive financial report, and addressed a variance request for a standby fire protection service.
Aug 12, 2026·Board meeting agenda
Public Service Board Regular Meeting
The meeting focused on the presentation and acceptance of the El Paso Water Utilities-Public Service Board Annual Comprehensive Financial Report for the fiscal year ending February 28, 2026. The independent audit, performed by Gibson, Ruddock, Patterson LLC, confirmed compliance with all applicable federal, state, and other accounting and financial reporting requirements.