Discover opportunities months before the RFP drops
Learn more →Police Major
Work Email
Direct Phone
Employing Organization
Board meetings and strategic plans from Kristina Andreu's organization
The workshop focused on providing a project update and technical assessment for the Shoreline project. Discussions centered on the feasibility and design concepts, including multimodal connectivity for pedestrians, cyclists, and vehicles. Key technical constraints were highlighted, such as the location of an existing 102-inch sewer pipe and environmental protections for petrified mangroves. The project team discussed efforts to improve mobility, restore coastal ecosystems, and provide flood mitigation. Future milestones include finalizing feasibility reports and developing a business plan to identify revenue streams for long-term operations and maintenance.
The council convened to discuss stormwater management strategies and projects, specifically debating the proposed ACOM system versus the GIT plan. Public concerns were raised regarding the potential environmental impact of the ACOM plan, including the removal of hundreds of trees, potential damage to the local bay, and issues with roadway elevation. Speakers emphasized the need for greater government transparency in project design and decision-making, and advocated for the GIT plan as a more cost-effective and environmentally sensitive solution for addressing long-term flooding and sea-level rise.
The council meeting focused on the evaluation of stormwater system alternatives for Zone 1, specifically comparing a centralized pump station design against a decentralized injection well system. Key discussion points included technical performance metrics such as discharge capacity, flood reduction effectiveness, system reliability, and long-term maintenance requirements. The discussion also addressed environmental impacts, regulatory compliance, constructability, construction disruption, project funding status, and cost analysis for each approach.
The committee meeting focused on a presentation regarding a proposed decentralized storm water management concept. Key discussion points included a review of data collection and hydrological modeling, a comparative analysis between centralized and decentralized system alternatives, and technical specifications for the installation of modular pump stations, hydrodynamic separators, and 24-inch diameter piping to improve drainage. Strategies for cost management and the proposed implementation schedule were reviewed. Additionally, the committee discussed the impact of flood events, the necessity of CCTV inspections for existing pipes, and the preference for drainage-focused retrofits over road raising.
The council meeting addressed several operational and infrastructure matters. Public comments included testimonials regarding a local crossing guard, a status report on a referendum for a charter amendment concerning large-scale stormwater or flood prevention projects exceeding $50 million, and a comparative analysis of centralized versus decentralized stormwater systems. The council discussed the deferral of a memorandum of agreement pending review of attached exhibits, authorized a review of the feasibility of website improvements to facilitate easier document searches, and requested an overarching plan from the manager and CFO to address potential revenue loss from tax changes. Additionally, the fire department provided context regarding the need for retroactive approval of a grant-related agreement.
Extracted from official board minutes, strategic plans, and video transcripts.
Decision makers at Village of Key Biscayne
Enrich your entire CRM with verified emails, phone numbers, and buyer intelligence for every account in your TAM.
Keep data fresh automatically
What makes us different
Jeremy Calleros-Gauger
Building, Zoning and Planning Director
Key decision makers in the same organization
© 2026 Starbridge