Signal Improvement - Central Boulevard at Broad Street
Posted
Nov 23, 2025
Aug 27, 2026
Work include 14 EA utility test pit unpaved; 5 EA utility test pit asphalt concrete; 5 EA utility test pit portland cement conc; 800 LF eradicate linear pvmt mrkg; 1,000 SF eradicate nonlinear pvmt mrkg; 36 CY conc. Found. Pf-8; 65 LF 8/3 conductor cable; 350 LF 14/2 conductor cable; 350 LF 14/4 conductor cable; 1,000 LF 14/5 conductor cable; 1,450 LF 10 conductor cable; 500 LF 8 conductor cable egc; 420 LF bored conduit 2"; 600 LF bored conduit 3"; 220 LF conduit pvc 2"; 80 LF conduit pvc 3"; 300 LF trench excavation eci-1.