Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Cobb County-Marietta Water Authority
Cobb County is soliciting sealed bids for the rehabilitation and replacement of ultraviolet disinfection systems at three water reclamation facilities, including Noonday Creek, Northwest Cobb, and R.L. Sutton. The project involves extensive upgrades to gates, valves, electrical systems, instrumentation, and HVAC, as well as the construction of a pre-engineered metal building. Bidders must be prequalified with the Cobb County Water System and attend a mandatory pre-bid meeting scheduled for May 21, 2026.
Posted Date
May 1, 2026
Due Date
Jun 11, 2026
Release: May 1, 2026
Cobb County-Marietta Water Authority
Close: Jun 11, 2026
Cobb County is soliciting sealed bids for the rehabilitation and replacement of ultraviolet disinfection systems at three water reclamation facilities, including Noonday Creek, Northwest Cobb, and R.L. Sutton. The project involves extensive upgrades to gates, valves, electrical systems, instrumentation, and HVAC, as well as the construction of a pre-engineered metal building. Bidders must be prequalified with the Cobb County Water System and attend a mandatory pre-bid meeting scheduled for May 21, 2026.
AvailableCobb County-Marietta Water Authority
The Cobb County-Marietta Water Authority is seeking to qualify up to two providers to provide on-call medium-voltage motor maintenance and rotating equipment (gearbox) services for its fleet of over 39 medium-voltage motors. Services will be procured on an as-needed basis with no guaranteed minimum or maximum work; firms must submit separate sealed proposals and bear the cost of proposal preparation. The event is open for proposals from 2026-04-07 through 2026-04-23 and lists buyer contact Lisa Rodriguez for procurement questions.
Posted Date
Apr 7, 2026
Due Date
Apr 23, 2026
Release: Apr 7, 2026
Cobb County-Marietta Water Authority
Close: Apr 23, 2026
The Cobb County-Marietta Water Authority is seeking to qualify up to two providers to provide on-call medium-voltage motor maintenance and rotating equipment (gearbox) services for its fleet of over 39 medium-voltage motors. Services will be procured on an as-needed basis with no guaranteed minimum or maximum work; firms must submit separate sealed proposals and bear the cost of proposal preparation. The event is open for proposals from 2026-04-07 through 2026-04-23 and lists buyer contact Lisa Rodriguez for procurement questions.
Cobb County-Marietta Water Authority
Cobb County Water System is soliciting sealed bids for the FY26 Zone 1 Miscellaneous Sewer Replacements project, which includes replacement of approximately 350 linear feet of 8-inch ductile iron sewer pipe and 150 linear feet of 10-inch ductile iron sewer pipe. Bidders must be prequalified with the Cobb County Water System and hold a State of Georgia Utility Contractor License to participate. The procurement is a sealed-bid invitation for bids with a submission deadline of March 12, 2026, at 12:00 PM Eastern.
Posted Date
Feb 13, 2026
Due Date
Mar 12, 2026
Release: Feb 13, 2026
Cobb County-Marietta Water Authority
Close: Mar 12, 2026
Cobb County Water System is soliciting sealed bids for the FY26 Zone 1 Miscellaneous Sewer Replacements project, which includes replacement of approximately 350 linear feet of 8-inch ductile iron sewer pipe and 150 linear feet of 10-inch ductile iron sewer pipe. Bidders must be prequalified with the Cobb County Water System and hold a State of Georgia Utility Contractor License to participate. The procurement is a sealed-bid invitation for bids with a submission deadline of March 12, 2026, at 12:00 PM Eastern.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Cobb County-Marietta Water Authority
The Board approved an Executive Session to facilitate the discussion of real estate matters.
The Board approved a sole-source contract with Pure Technologies U.S., Inc. for condition assessment services on the Highway 41 water main and a five-year preventative maintenance agreement with McNaughton-McKay Electric Company for variable frequency drives. Additionally, the Board updated its Prequalified Pipeline Contractors List for ductile iron pipe, awarded the Quarles 6 MG Clearwell No. 1 Tank Concrete Repairs and Coating Project to DN Tanks of Georgia, LLC, and awarded the Pine Mountain Tank Replacement project to Cleary Construction, Inc. The Board also approved a Memorandum of Agreement for the Third Army Road Water Main Extension, an information management services agreement with the Atlanta Regional Commission, and an executive session for real estate and cybersecurity discussions.
The Cobb County-Marietta Water Authority's Level of Service Goals (LOSGs) outline the criteria for evaluating its infrastructure and guiding capital improvement planning to ensure sustainable and reliable drinking water and fire protection. The plan is structured around key areas including ensuring sufficient water supply and permitted capacity, maintaining high water quality standards, establishing redundancy and reliability in storage and transmission systems, optimizing transmission hydraulics, and fostering integrated planning and effective communication with wholesale customers and stakeholders.
The Board took several actions during the meeting. Key actions included approving a Task Authorization in the amount of $255,309 under the Engineering On-Demand Services contract with Engineering Strategies, Inc. of Marietta, Georgia.
The Board took several actions during the meeting, which was held in a hybrid format. Key decisions included approving travel expenses for the Board and Attorney to attend the American Water Works Association Annual Conference in Washington D.C. in June 2026. Furthermore, the Board approved an On-Demand Services Task Authorization to Hazen and Sawyer, PC, not to exceed $501,613, for additional engineering services related to the Quarles Reservoir Cleaning and Improvements Project. An Executive Session was also approved for the discussion of Pending and Potential Litigation.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Cobb County-Marietta Water Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge