Lynchburg Pump Station Fabricate & Delivery of Trash Screens RFP
Posted
Sep 13, 2026
Oct 1, 2026
Provide fabricate and deliver two (2) sets of trash screens for use at a water pumping facility.
Track open bid opportunities, contracts, public meetings, and key contacts for Coastal Water Authority.
Share your ICP and we will surface 10 ready-to-buy accounts using buying signals, competitor contracts, and procurement activity for free
See my top accountsActive opportunities open for bidding
Posted
Sep 13, 2026
Oct 1, 2026
Provide fabricate and deliver two (2) sets of trash screens for use at a water pumping facility.
Posted
Sep 3, 2026
Oct 1, 2026
Work includes the removal of the existing exterior coating system, surface preparation, and application of a new protective coating system to cwa s existing air valves located above ground and within vaults and manways.
Posted
Jul 17, 2026
Sep 24, 2026
This project involves the replacement of approx 15,750 LF of 8" through 24" transmission waterlines, including a 48" magnetic flow meter, valves, fittings, and associated appurtenances with trenchless installation at designated crossings.
Key metrics and characteristics
City
The city where this buyer is located.
Houston
County
The county where this buyer is located.
Harris
Address
Physical address of this buyer.
1801 Main St
Phone Number
Contact phone number for this buyer.
(713) 658-9020
Zip Code
Postal code for this buyer's location.
77002
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
Startup Friendliness
How often this buyer champions startups and early adoption.
Latest Budget Year
Unlock to view
Operating Budget
Unlock to view
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
AI-ranked best-fit opportunities before bid boards
Auto-drafted, compliance-ready outlines & boilerplate
Board meetings and strategic plans from Coastal Water Authority
The board discussed operations and maintenance, specifically authorizing the rehabilitation of pump and motor equipment at the Lynchburg Pump Station. Capital project agenda items included authorizing a request for bids for the Bayport Waterline Replacement Phase 4 and applying for Texas Water Development Board funding for the same. The board also moved to negotiate a contract for construction manager at risk services for Trinity River System facilities improvements and received status updates on multiple infrastructure and pipeline projects. Additionally, the board reviewed financial statements, updated investment transaction signatories, adopted an amended investment policy, approved disbursements, and introduced a new Government Affairs Manager.
The Board of Directors recognized the reappointment of a board member, receiving their oath of office and bond. Operations staff provided a report on raw surface water production data. Key approvals included a contract amendment for the Lake Houston Dam Spillway Improvement Project physical hydraulic modeling, the authorization of a work order for general engineering consultant services for the Trinity River System, the renewal of the business insurance policy with the Texas Water Conservation Association Risk Management Fund, and the renewal of group medical and dental insurance policies. Additionally, board members authorized disbursements for various construction funds.
Public-sector contacts connected to Coastal Water Authority.
Get relevant Coastal Water Authority bid alerts
Track Coastal Water Authority bids, renewals, public meetings, and contact changes matched to what you sell.
Competitor & pricing intel from past awards
Native sync to Salesforce & HubSpot
The Board discussed and acted upon several operational and financial matters. Key actions included the confirmation and ratification of Board officer re-elections, authorization for a public review period regarding a canal easement abandonment, and the designation of pre-qualified firms for subsurface utility engineering services. The Board reviewed and approved financial statements and the quarterly internal management report, as well as construction fund disbursements. Additionally, an update was provided on the recent procurement of a one-year electricity contract.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Coastal Water Authority meetings, strategic plans, and budget discussions before the public bid appears.
Early signals from meeting minutes and plans
Vendor mentions and competitor tracking
Decision timeline from discussion to RFP
Quotable insights from buyer leadership