Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Clean Water Services
Furnish all labor, materials, and equipment necessary to: Demolition and removal of existing single-phase pumps, associated below-grade piping/valving, and electrical components (generator and control panel); Civil site demolition and concrete slab and generator slab construction; Extend new 480-volt three-phase power service to the pump station from an existing Forest Grove Light & Power pole; Installation of new three-phase pumps, above-grade piping/valving, and associated instrumentation; Installation of new electrical components, conduits, and wiring for new three-phase service onsite; Installation of Owner-supplied standby generator and automatic transfer switch, and contractor procured control panel; Temporary erosion control measures and a temporary bypass pumping system to facilitate construction sequencing for a continuously operated wastewater pump station.
Posted Date
Mar 25, 2026
Due Date
Apr 22, 2026
Release: Mar 25, 2026
Clean Water Services
Close: Apr 22, 2026
Furnish all labor, materials, and equipment necessary to: Demolition and removal of existing single-phase pumps, associated below-grade piping/valving, and electrical components (generator and control panel); Civil site demolition and concrete slab and generator slab construction; Extend new 480-volt three-phase power service to the pump station from an existing Forest Grove Light & Power pole; Installation of new three-phase pumps, above-grade piping/valving, and associated instrumentation; Installation of new electrical components, conduits, and wiring for new three-phase service onsite; Installation of Owner-supplied standby generator and automatic transfer switch, and contractor procured control panel; Temporary erosion control measures and a temporary bypass pumping system to facilitate construction sequencing for a continuously operated wastewater pump station.
AvailableClean Water Services
Project consists of the following work: furnishing the labor, materials and equipment to rehabilitate approx 4,500 LF of eight-inch clay and concrete pipe and associated manholes and sewer laterals connected to the mainlines. Rehabilitation will be completed using trenchless pipe bursting to minimize surface disturbance.
Posted Date
Mar 16, 2026
Due Date
Apr 15, 2026
Release: Mar 16, 2026
Clean Water Services
Close: Apr 15, 2026
Project consists of the following work: furnishing the labor, materials and equipment to rehabilitate approx 4,500 LF of eight-inch clay and concrete pipe and associated manholes and sewer laterals connected to the mainlines. Rehabilitation will be completed using trenchless pipe bursting to minimize surface disturbance.
AvailableClean Water Services
The project includes Construct and commission a new engineered media biofilter (biofilter). The biofilter will be a single-cell, reinforced concrete basin with integral air distribution, internal high-density polyethylene liner, engineered media, media floor support system, water panel, and humidification and irrigation system, Install and commission two new odor control fans located adjacent to the new engineered media biofilter, Modify, re-route, and provide new foul air ducting and supports within the Headworks facility to the new odor control fans and biofilter, Demolish the existing odor mist scrubber, including the existing odor exhaust fan, unused foul air duct, low-pressure air piping, and chemical piping, Install and commission two Owner-furnished variable speed drives in the upper electrical room, Install instrumentation and control stations, associated conduits, conductors, and other appurtenances necessary to complete the Work, Fill abandoned force mains below the footprint of the new biofilter with grout, Finish grading to incorporate the biofilter into the earthen bank south of Headworks, including a new concrete stairway alongside the north edge of the biofilter and a cart path extending south from the fan pad to the digester gas treatment skid, Install site lighting to illuminate access around the biofilter, odor control fans, and cart path, Install irrigation sleeves at hardscape crossings. Final landscaping and site irrigation will be by Owner, Install new drainage piping and manhole for the biofilter drain, connecting to the existing sanitary sewer line.
Posted Date
Mar 9, 2026
Due Date
Apr 23, 2026
Release: Mar 9, 2026
Clean Water Services
Close: Apr 23, 2026
The project includes Construct and commission a new engineered media biofilter (biofilter). The biofilter will be a single-cell, reinforced concrete basin with integral air distribution, internal high-density polyethylene liner, engineered media, media floor support system, water panel, and humidification and irrigation system, Install and commission two new odor control fans located adjacent to the new engineered media biofilter, Modify, re-route, and provide new foul air ducting and supports within the Headworks facility to the new odor control fans and biofilter, Demolish the existing odor mist scrubber, including the existing odor exhaust fan, unused foul air duct, low-pressure air piping, and chemical piping, Install and commission two Owner-furnished variable speed drives in the upper electrical room, Install instrumentation and control stations, associated conduits, conductors, and other appurtenances necessary to complete the Work, Fill abandoned force mains below the footprint of the new biofilter with grout, Finish grading to incorporate the biofilter into the earthen bank south of Headworks, including a new concrete stairway alongside the north edge of the biofilter and a cart path extending south from the fan pad to the digester gas treatment skid, Install site lighting to illuminate access around the biofilter, odor control fans, and cart path, Install irrigation sleeves at hardscape crossings. Final landscaping and site irrigation will be by Owner, Install new drainage piping and manhole for the biofilter drain, connecting to the existing sanitary sewer line.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Clean Water Services
The meeting includes reports from the 2026 D&C Stormwater Revision Subcommittee, a summary of federal and state legislative session outcomes, and a presentation on the updated Climate Action Strategic Roadmap. This roadmap focuses on climate mitigation to reduce greenhouse gas emissions and adaptation strategies to manage climate-related risks, including facility vulnerability assessments and infrastructure protection plans.
The meeting included a presentation on the 'Love Letters to Water' initiative for the new laboratory building in Forest, which seeks community and staff input through various creative submissions. The commission discussed the formation of a subcommittee for design and construction standards, with a focus on stormwater management requirements and upcoming timeline milestones. Additionally, representatives provided an update on a multi-year cost of service study and rate development plan, detailing the distinctions between regional and local services provided to various jurisdictions within the service area.
The meeting included an announcement regarding a 'Love Letters to Water' art project for a new laboratory facility. The committee discussed volunteer participation for a subcommittee focused on design and construction standards. There were updates provided on the timeline for storm water permitting requirements and public forum scheduling. Additionally, finance staff presented a detailed report on a cost of service study and rate development, covering service allocations for regional and local utilities.
The board meeting primarily focused on a presentation regarding the update of the cooperative management Intergovernmental Agreement (IGA) between Clean Water Services, Washington County, and the Urban Road Maintenance District. Staff discussed the two-year collaborative process taken to update the 2005 IGA, highlighting new process improvements, clearly defined roles and responsibilities, and a new capital project flowchart with stage gates to enhance coordination. The board also addressed public communication topics and approved the new cooperative management IGA.
The board discussed and took action on several items. Key topics included the establishment of final reimbursement charges for the Northwest 111th Court at Northwest McDaniel Road Sewer Extension Reimbursement District. Additionally, the board adopted three administrative policies regarding no discrimination and harassment, principles of respect, and workplace investigations. The meeting also included director announcements regarding upcoming meeting dates.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Clean Water Services's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database