Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Wilder
The project generally includes site clearing, grubbing, construction of dual 20 million gallon HDPE lined storage lagoons, approx., 9,000 LF of miscellaneous piping ranging from 6" to 12" in diameter, piped waterway crossings including one bore, a submersible recycled water pump station, a vertical turbine pump back pump station, a vertical turbine irrigation pump station, associated electrical equipment, groundwater monitoring wells, site fencing, gravel access roads, flow measurement structures, surface grading and irrigation supply/collection ditches, other irrigation conveyance piping and features, and other miscellaneous site work associated with an 80-acre land application site.
Posted Date
May 21, 2026
Due Date
Jun 16, 2026
Release: May 21, 2026
City of Wilder
Close: Jun 16, 2026
The project generally includes site clearing, grubbing, construction of dual 20 million gallon HDPE lined storage lagoons, approx., 9,000 LF of miscellaneous piping ranging from 6" to 12" in diameter, piped waterway crossings including one bore, a submersible recycled water pump station, a vertical turbine pump back pump station, a vertical turbine irrigation pump station, associated electrical equipment, groundwater monitoring wells, site fencing, gravel access roads, flow measurement structures, surface grading and irrigation supply/collection ditches, other irrigation conveyance piping and features, and other miscellaneous site work associated with an 80-acre land application site.
AvailableCity of Wilder
Construction of missing gap of sidewalk, approx. 620', on 1st. street.
Posted Date
Feb 27, 2026
Due Date
Mar 26, 2026
Release: Feb 27, 2026
City of Wilder
Close: Mar 26, 2026
Construction of missing gap of sidewalk, approx. 620', on 1st. street.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge