Van Buren Wastewater Improvements RFP
Posted
Sep 8, 2026
Oct 13, 2026
The Work of this Contract consists of the following: 1. Wastewater Treatment Facility Upgrades - Construction and installation of a mechanical influent screen and the replacement of oxidation ditch rotors 2. Collection System Rehabilitation & Upgrades - Collection System: Rehabilitation of the existing sewer system includes point repairs, lining or replacement of manholes and gravity sewers, as well as other miscellaneous repairs - Terminal Lift Station: Installation of a level sensing probe to replace the existing float pump controls, replacement of the cell monitoring system and raising all electric components out of the floodplain.