Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $25,000, use sole source.
Coops: Lead with Sourcewell cooperative purchasing to bypass formal bidding.
City of Terre Haute (IN) adheres strictly to competitive bidding. There is no evidence of sole source awards above the $25,000 threshold.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Terre Haute's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Housing Inspector
Chief of Police
Chief Deputy Controller
Lead Building Inspector
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Terre Haute
The City of Terre Haute, Indiana is soliciting sealed bids for its 2026 Community Crossings Matching Grant (CCMG) street paving project. Bid documents and plans are posted on HWC Engineering’s online planroom, where registered vendors can download the project manual and drawings. Bids are due to the City by January 26, 2026 at 9:00 AM local time.
Posted Date
-
Due Date
Jan 26, 2026
Release: -
City of Terre Haute
Close: Jan 26, 2026
The City of Terre Haute, Indiana is soliciting sealed bids for its 2026 Community Crossings Matching Grant (CCMG) street paving project. Bid documents and plans are posted on HWC Engineering’s online planroom, where registered vendors can download the project manual and drawings. Bids are due to the City by January 26, 2026 at 9:00 AM local time.
AvailableCity of Terre Haute
The contract will consist of the following: Rehabilitation (lining) via Cured-in-Place Pipe (CIPP) of approx. 3,130 LF of 20" force main, and replacement, via open cut, of approx. 540 LF of 18" force main, and new construction of approx. 95 LF of 24" and 20 LF of 30" gravity sewers via open cut; replacement of the existing Park Avenue Lift Station, including bypass pumping, removal of existing lift station equipment and associated structures, installation of new structures, piping, pumping equipment and associated appurtenances, and site improvements.
Posted Date
Nov 7, 2025
Due Date
Dec 5, 2025
Release: Nov 7, 2025
City of Terre Haute
Close: Dec 5, 2025
The contract will consist of the following: Rehabilitation (lining) via Cured-in-Place Pipe (CIPP) of approx. 3,130 LF of 20" force main, and replacement, via open cut, of approx. 540 LF of 18" force main, and new construction of approx. 95 LF of 24" and 20 LF of 30" gravity sewers via open cut; replacement of the existing Park Avenue Lift Station, including bypass pumping, removal of existing lift station equipment and associated structures, installation of new structures, piping, pumping equipment and associated appurtenances, and site improvements.
City of Terre Haute
Work includes installing approx. 4,280 LF of new roadway alignment including: storm sewer, lighting conduit, pavement markings, and signage. The work will also consist of the removal of existing avenue, installation of a detention pond, maintenance of traffic, temporary erosion control, seeding/sodding and a roundabout at the intersection. The work also includes the installation of new sanitary sewer and water main. Also includes 7,146 LF of video inspection for pipe; see outside link.
Posted Date
Oct 14, 2025
Due Date
Nov 25, 2025
Release: Oct 14, 2025
City of Terre Haute
Close: Nov 25, 2025
Work includes installing approx. 4,280 LF of new roadway alignment including: storm sewer, lighting conduit, pavement markings, and signage. The work will also consist of the removal of existing avenue, installation of a detention pond, maintenance of traffic, temporary erosion control, seeding/sodding and a roundabout at the intersection. The work also includes the installation of new sanitary sewer and water main. Also includes 7,146 LF of video inspection for pipe; see outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.