Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Spring Valley
This work shall consist of constructing bituminous surface treatment (A-1 and A-2) and related items on various streets.
Posted Date
May 5, 2026
Due Date
Jul 13, 2026
Release: May 5, 2026
City of Spring Valley
Close: Jul 13, 2026
This work shall consist of constructing bituminous surface treatment (A-1 and A-2) and related items on various streets.
AvailableCity of Spring Valley
Complete removal of 9,600+ SF of the 3-tab asphalt shingled roof system down to the existing wood roof deck and installing a complete new roof system consisting of dimensional asphalt roof shingles, gutters and downspouts, metal valley flashing, drip edge and attic ventilators. Removal and replacement of some existing fascia board and aluminum cover can be expected. Area of damage and amount required shall be determined in the field by the Engineer after the existing gutters have been removed. All of this work will be as part of the base bid.
Posted Date
-
Due Date
Aug 19, 2024
Release: -
City of Spring Valley
Close: Aug 19, 2024
Complete removal of 9,600+ SF of the 3-tab asphalt shingled roof system down to the existing wood roof deck and installing a complete new roof system consisting of dimensional asphalt roof shingles, gutters and downspouts, metal valley flashing, drip edge and attic ventilators. Removal and replacement of some existing fascia board and aluminum cover can be expected. Area of damage and amount required shall be determined in the field by the Engineer after the existing gutters have been removed. All of this work will be as part of the base bid.
City of Spring Valley
Replacement of approx 966 L.F. of existing 12" clay sanitary sewer with 18" SDR-26 PVC using an open-cut excavation, including removal and replacement of any existing service lateral connections, connections to manholes, removal and reconstruction of sanitary manholes, bypass pumping, placing new pipeline in service, and surface restoration.
Posted Date
Oct 23, 2024
Due Date
Nov 21, 2024
Release: Oct 23, 2024
City of Spring Valley
Close: Nov 21, 2024
Replacement of approx 966 L.F. of existing 12" clay sanitary sewer with 18" SDR-26 PVC using an open-cut excavation, including removal and replacement of any existing service lateral connections, connections to manholes, removal and reconstruction of sanitary manholes, bypass pumping, placing new pipeline in service, and surface restoration.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $25,000, use sole source.
Coops: Lead with Sourcewell to move fast and bypass bidding.
City of Spring Valley, IL: No evidence of sole-source contracting; the city relies on formal processes and maintains a strict $25,000 competitive bidding threshold.
Board meetings and strategic plans from City of Spring Valley
The Nottawa Township Master Plan serves as a guide for future development, emphasizing the protection of natural resources and the preservation of the Township's agricultural and rural character. Its core objectives include supporting existing residents, diversifying housing options while maintaining rural integrity, and preserving productive agricultural areas. The plan also outlines strategies for commercial and limited industrial development, ensuring adequate open space and recreation, and encouraging the development of public utilities, telecommunications, and alternative energy systems. The overarching vision is to sustain the Township's predominantly agricultural and low-density residential environment for the long term.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Spring Valley's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge