Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Siletz
Work includes approx 160 LF of 1" Water service line; 94 LF of Concrete Valley Gutter; 25 LF of 10" Ø ADS Culvert Cleaning & Extension; 12 EA of Precast Concrete Wheel Stops; 18 LF of Pavilion Lighting (Design-Build); 10 EA of Pavilion Receptacles (Design-Build).
Posted Date
Apr 9, 2026
Due Date
Apr 28, 2026
Release: Apr 9, 2026
City of Siletz
Close: Apr 28, 2026
Work includes approx 160 LF of 1" Water service line; 94 LF of Concrete Valley Gutter; 25 LF of 10" Ø ADS Culvert Cleaning & Extension; 12 EA of Precast Concrete Wheel Stops; 18 LF of Pavilion Lighting (Design-Build); 10 EA of Pavilion Receptacles (Design-Build).
AvailableCity of Siletz
Roadway repair and improvements along SW Swan Avenue and Scarlett Street includes: approximately 3,672 square feet of roadway reconstruction, 420 square yards of asphalt concrete pavement removal, 500 tons of asphalt concrete pavement, and 3,250 square yards of paving fabric. \r Other work includes: traffic control, demolition work, aggregate base, manhole adjustments, striping, landscaping, and other miscellaneous items.
Posted Date
Jun 13, 2025
Due Date
Jul 2, 2025
Release: Jun 13, 2025
City of Siletz
Close: Jul 2, 2025
Roadway repair and improvements along SW Swan Avenue and Scarlett Street includes: approximately 3,672 square feet of roadway reconstruction, 420 square yards of asphalt concrete pavement removal, 500 tons of asphalt concrete pavement, and 3,250 square yards of paving fabric. \r Other work includes: traffic control, demolition work, aggregate base, manhole adjustments, striping, landscaping, and other miscellaneous items.
City of Siletz
The project consists of: Solids Dewatering Building with a Screw Press Room and Cake Storage Room; Class A Capable Screw Press with Associated Appurtenances; Municipal Sludge Storage Tank with Associated Appurtenances and Pile Foundation; Storage Tank Aeration Equipment and Appurtenances including Associated Piping and Valving; Aluminum Stairs with Foundation; Demolition of Existing Wastewater Treatment Process Areas; Site Improvements including Fill and Pre-Load of the Building Site; and Existing Surge Basin Improvements. Contract(s) resulting from the City of Siletz - WWTP Phase 1 Equipment Procurement - Schedules A, B, & C shall be assigned to the Contractor upon execution by the City.
Posted Date
May 14, 2025
Due Date
May 29, 2025
Release: May 14, 2025
City of Siletz
Close: May 29, 2025
The project consists of: Solids Dewatering Building with a Screw Press Room and Cake Storage Room; Class A Capable Screw Press with Associated Appurtenances; Municipal Sludge Storage Tank with Associated Appurtenances and Pile Foundation; Storage Tank Aeration Equipment and Appurtenances including Associated Piping and Valving; Aluminum Stairs with Foundation; Demolition of Existing Wastewater Treatment Process Areas; Site Improvements including Fill and Pre-Load of the Building Site; and Existing Surge Basin Improvements. Contract(s) resulting from the City of Siletz - WWTP Phase 1 Equipment Procurement - Schedules A, B, & C shall be assigned to the Contractor upon execution by the City.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track City of Siletz's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database