City of Patton Village Road Repairs
Posted
Sep 22, 2026
Oct 13, 2026
Work includes 28 SY remove existing driveway (all materials); 3,174 tn d-gr hmac (2")(type d)(pg64-22); 36,713 SY hot mix asphaltic concrete base course (black base) (6"); 36,600 SY lime-fly ash treatment (6in depth); 3,695 SY crushed concrete base (8in depth); 15 SY high early strength concrete driveway (6 in depth). See attache file.

