City of Oconomowoc Village Green Park Improvements
Aug 14, 2026
Closes
Sep 3, 2026
Removals: excavation common, landscaping, existing asphalt parking surface and sidewalks, curbs, sea wall, clearing and grubbing and existing site amenities. Erosion control: erosion mat, turbidity barrier, silt fence maintenance, sediment logs, and stormwater basins. Site improvements: concrete sidewalk, asphalt parking paving, curb and gutter, integral curb and gutter, pavement marking, dense grade base, detectable warning fields, boardwalk with composite decking, thickened edge concrete sidewalk, steps, railings, irrigation system, park benches, seat walls with lighting, bike racks, bollards, site signage and pavement marking. Utilities: new sanitary sewer service and service connection new water service and permanent irrigation system site lighting and underground conduit new electrical service and connection stormwater structures site and turf restoration: site and turf restoration, sodding, planting, mulching, general site clean-up and amenities installed.