Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Oak Grove
The City of Oak Grove, Missouri is seeking proposals from qualified service providers for HVAC system replacement work at the Public Safety/Animal Control Shelter located at 1903 S Broadway, Oak Grove, MO 64075. The scope includes removal of the old HVAC system, installation of a new 15-ton condenser with matching air handler, new line sets, ductwork modifications, electrical and gas connections, a new natural gas duct heater, and various duct/vent work for the kennel area and break room. Proposals must be received by the City Clerk at City Hall (2110 S Broadway) by 10:00 AM on August 11, 2026, with anticipated board approval on August 17, 2026 and project completion by November 13, 2026.
Posted Date
Jul 15, 2026
Due Date
Aug 11, 2026
Release: Jul 15, 2026
City of Oak Grove
Close: Aug 11, 2026
The City of Oak Grove, Missouri is seeking proposals from qualified service providers for HVAC system replacement work at the Public Safety/Animal Control Shelter located at 1903 S Broadway, Oak Grove, MO 64075. The scope includes removal of the old HVAC system, installation of a new 15-ton condenser with matching air handler, new line sets, ductwork modifications, electrical and gas connections, a new natural gas duct heater, and various duct/vent work for the kennel area and break room. Proposals must be received by the City Clerk at City Hall (2110 S Broadway) by 10:00 AM on August 11, 2026, with anticipated board approval on August 17, 2026 and project completion by November 13, 2026.
AvailableCity of Oak Grove
This contract provides work for thermoplastic pavement marking yellow and white at various widths and lengths. This will also include turn lanes, stop bars, and any letters and symbols necessary to complete the 2026 pavement marking project
Posted Date
Apr 2, 2026
Due Date
Apr 14, 2026
Release: Apr 2, 2026
City of Oak Grove
Close: Apr 14, 2026
This contract provides work for thermoplastic pavement marking yellow and white at various widths and lengths. This will also include turn lanes, stop bars, and any letters and symbols necessary to complete the 2026 pavement marking project
City of Oak Grove
The City of Oak Grove, Missouri is soliciting sealed bids for cleaning and painting the top surface of the Frick Water Tower in accordance with Missouri Department of Natural Resources specifications. The scope includes protecting any apparatus atop the tower, verifying proper operation after completion, and cleaning/painting an estimated 5,285 square feet. Bids are due March 24, 2026, and the solicitation was published on March 6, 2026.
Posted Date
Mar 6, 2026
Due Date
Mar 24, 2026
Release: Mar 6, 2026
City of Oak Grove
Close: Mar 24, 2026
The City of Oak Grove, Missouri is soliciting sealed bids for cleaning and painting the top surface of the Frick Water Tower in accordance with Missouri Department of Natural Resources specifications. The scope includes protecting any apparatus atop the tower, verifying proper operation after completion, and cleaning/painting an estimated 5,285 square feet. Bids are due March 24, 2026, and the solicitation was published on March 6, 2026.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $4,500, sole source is theoretically possible, but do not pursue sole source; approvals are unlikely.
Coops: Frequently procures through Sourcewell and Missouri statewide co-op; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
City of Oak Grove, MO: No evidence of sole source awards. The city favors competition for purchases over $4,500, making sole source justifications unlikely to succeed.
Board meetings and strategic plans from City of Oak Grove
The commission reviewed and recommended approval to the Board of Alderman for the final plat of Oaks of Edgewood phase 17. The staff provided a report confirming that the plat met all city subdivision regulations, design standards, and approval criteria, noting that this phase completes the subdivision. The discussion also addressed the process for potential future development of adjacent unincorporated land, which would require annexation, rezoning, and further commission review.
The meeting agenda includes public comments and the review of financial documents, specifically the May 2026 financial statement and the sales tax report. The council will deliberate on a site plan design review, the purchase of shade structures, and the wastewater master plan. Additionally, the agenda covers the presentation of general information and reports.
The board discussed potential design elements for the remodeled Farmers Market area, including parking, landscaping, and infrastructure requirements such as utilities and traffic flow. Additionally, the board reviewed and moved to recommend for final approval a plan for installing shade structures at Webb Park and Frick Park. Reports were provided regarding the upcoming Sparks & Stripes event, completed sidewalk work at Webb Park, maintenance on park amenities, collaboration with a local tractor pull organization, and the scheduling of upcoming equestrian events at the arena.
The meeting included discussions on a site plan review and renovation application for the Evergy Service Center, which involves structural modifications and aesthetic improvements to fencing. Additionally, the Board considered the purchase of shade structures for Web Park and Frick Park, addressing design requirements, project scope, and the integration of site amenities like picnic tables and concrete pads.
The meeting featured a public comment regarding safety concerns related to ebikes and scooters, specifically focusing on the need for licensing and adherence to traffic regulations. Following the public comment, the board conducted a Panther Proclamation ceremony to recognize numerous high school students for their academic, athletic, and extracurricular achievements in various disciplines, including sports, music, speech, and debate.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Oak Grove's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge