Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Morgans Point's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Court Clerk
City Administrator
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Morgans Point
Work includes mowing right of ways, parks, sidewalks, and city cemetery.
Posted Date
Jan 8, 2026
Due Date
Jan 26, 2026
Release: Jan 8, 2026
City of Morgans Point
Close: Jan 26, 2026
Work includes mowing right of ways, parks, sidewalks, and city cemetery.
AvailableCity of Morgans Point
Installation of approx. 200 LF of new storm sewer, inlets, and manholes for the wastewater treatment plant effluent outfall. Site Restoration including shaping and grading to restore site to previous conditions; Hydro-mulch seeding all disturbed areas including topsoil, fertilizer, and vegetative watering; Bypass Pumping as needed to maintain effluent flow; 215 LF Install 18" HDPE Storm Sewer via Open-Cut Installation;
Posted Date
Mar 15, 2025
Due Date
Apr 1, 2025
Release: Mar 15, 2025
City of Morgans Point
Close: Apr 1, 2025
Installation of approx. 200 LF of new storm sewer, inlets, and manholes for the wastewater treatment plant effluent outfall. Site Restoration including shaping and grading to restore site to previous conditions; Hydro-mulch seeding all disturbed areas including topsoil, fertilizer, and vegetative watering; Bypass Pumping as needed to maintain effluent flow; 215 LF Install 18" HDPE Storm Sewer via Open-Cut Installation;
City of Morgans Point
Project consists of 1 EA. service Connection to waterline complete and in place; 1 EA. service Connection to sewerline complete and in place; 1 EA. provide and Install 1" water meter; 1 EA. provide and Install 1-1/2" back-flow preventer; 225 SF provide and Install reinforced concrete slab for restroom building; 360 LF provide and install 10' high black vinyl coated chain link fence; 1 LS provide and install multipurpose court with acrylic surface paint including striping.
Posted Date
Dec 11, 2024
Due Date
Jan 28, 2025
Release: Dec 11, 2024
City of Morgans Point
Close: Jan 28, 2025
Project consists of 1 EA. service Connection to waterline complete and in place; 1 EA. service Connection to sewerline complete and in place; 1 EA. provide and Install 1" water meter; 1 EA. provide and Install 1-1/2" back-flow preventer; 225 SF provide and Install reinforced concrete slab for restroom building; 360 LF provide and install 10' high black vinyl coated chain link fence; 1 LS provide and install multipurpose court with acrylic surface paint including striping.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.