Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Monticello
Rehabilitation of existing trail with new surface material (approx. 2 miles long), remove 3 existing bridges and install 3 new bridges provided by the city, construct concrete bridge abutments, construct non-motorized concrete boat ramp, install culverts ranging from 12-48 inches diameter around trail, and re- medial grading at specific sites around the trail.
Posted Date
May 6, 2026
Due Date
May 27, 2026
Release: May 6, 2026
City of Monticello
Close: May 27, 2026
Rehabilitation of existing trail with new surface material (approx. 2 miles long), remove 3 existing bridges and install 3 new bridges provided by the city, construct concrete bridge abutments, construct non-motorized concrete boat ramp, install culverts ranging from 12-48 inches diameter around trail, and re- medial grading at specific sites around the trail.
AvailableCity of Monticello
Seeking qualified contractors to construct a fully functional rv waste station consisting of a reinforced concrete pad, drainage infrastructure, and associated site improvements. The facility shall be designed to accommodate heavy and continuous rv traffic and function similarly to a drive through approach with integrated waste disposal.
Posted Date
Apr 22, 2026
Due Date
May 14, 2026
Release: Apr 22, 2026
City of Monticello
Close: May 14, 2026
Seeking qualified contractors to construct a fully functional rv waste station consisting of a reinforced concrete pad, drainage infrastructure, and associated site improvements. The facility shall be designed to accommodate heavy and continuous rv traffic and function similarly to a drive through approach with integrated waste disposal.
City of Monticello
Provide and deliver three (3) pre-manufactured pedestrian bridges. Fully engineered half through truss pedestrian bridge of steel construction and shall be regarded as minimum standards for design and fabrication. The work included under this item shall consist of design, fabricating, finishing and transporting the steel truss bridge superstructure including bearings.
Posted Date
Jan 28, 2026
Due Date
Feb 11, 2026
Release: Jan 28, 2026
City of Monticello
Close: Feb 11, 2026
Provide and deliver three (3) pre-manufactured pedestrian bridges. Fully engineered half through truss pedestrian bridge of steel construction and shall be regarded as minimum standards for design and fabrication. The work included under this item shall consist of design, fabricating, finishing and transporting the steel truss bridge superstructure including bearings.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge