Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Melbourne
Work includes paving recreational park parking lot with at least 2 inches of hot mix, with leveling where needed.
Posted Date
Jun 10, 2026
Due Date
Jun 19, 2026
Release: Jun 10, 2026
City of Melbourne
Close: Jun 19, 2026
Work includes paving recreational park parking lot with at least 2 inches of hot mix, with leveling where needed.
AvailableCity of Melbourne
Work includes approx 9,124 LF of 8" sewer lines CIPP by UV light cure; 150 VF 19 manholes manhole rehabilitation by monolithic concrete liner (monoform); manhole frame and grade adjustments; pre and post CCTV and cleaning; spot repair of mains as required for CIPP lining. 1 LS mobilization / demobilization & closeout (max. 5% of total bid); 6,908 LF cleaning & pre-CCTV sewer mains (all sizes); 2 EA spot repair of existing mains, as required for CIPP lining; 4,840 SY hydro-mulching / seeding; 50 LF curb & gutter replacement; 1 LS highway 9 pump station rehabilitation; 20 EA manhole replacement (precast); 150 VF manhole rehabilitation (monoform); 5,841 LF 8" cured in place pipe (CIPP); 1,067 LF 10" cured in place pipe (CIPP); 150 SY asphalt street repair; 70 SY state highway asphalt repair. See attached file.
Posted Date
Mar 10, 2025
Due Date
Apr 8, 2025
Release: Mar 10, 2025
City of Melbourne
Close: Apr 8, 2025
Work includes approx 9,124 LF of 8" sewer lines CIPP by UV light cure; 150 VF 19 manholes manhole rehabilitation by monolithic concrete liner (monoform); manhole frame and grade adjustments; pre and post CCTV and cleaning; spot repair of mains as required for CIPP lining. 1 LS mobilization / demobilization & closeout (max. 5% of total bid); 6,908 LF cleaning & pre-CCTV sewer mains (all sizes); 2 EA spot repair of existing mains, as required for CIPP lining; 4,840 SY hydro-mulching / seeding; 50 LF curb & gutter replacement; 1 LS highway 9 pump station rehabilitation; 20 EA manhole replacement (precast); 150 VF manhole rehabilitation (monoform); 5,841 LF 8" cured in place pipe (CIPP); 1,067 LF 10" cured in place pipe (CIPP); 150 SY asphalt street repair; 70 SY state highway asphalt repair. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge