Mahr Park Trail Expansion – Phase 3
Posted
Sep 2, 2026
Sep 17, 2026
The project will consist of asphalt pavement trail installation, construction of three wooden boardwalks of varying lengths, construction of a 210 foot bridge with a lookout crossing a pond, construction of swales and storm systems, excavation, and reseeding.
