CDBG Downtown Sidewalks RFP
Posted
Sep 9, 2026
Sep 29, 2026
Work inlcudes 3 SY filter fabric (ty 2); 1 EA concrete washout; 459 SY remov conc (sidewalk, ramp, or sup); 21 SY removing conc (driveways); 5 LF remov conc (rail); 256 LF remov conc (sawcut); 39 SY rmv (8") trt/untrt base & asph pav; 25 SY remov conc (retaining walls); 5 EA remove & replace hitching rings; 1 EA remove & replace sidewalk etching; 326 LF conc curb (ty ii); 3 EA replace existing aluminum signs (ty a); 30 LF refl pav mrk ty i (w)24"(sld)(090mil). See attached file.
