2026 PCC Panel Replacement Project RFP
Aug 19, 2026
Closes
Sep 2, 2026
Removal of existing surfacing; construction of 8" pcc pavement patching; seeding; and miscellaneous associated work including cleanup. Traffic control and protection 1 ls, erosion control 1 ls, hydraulic seeding, fertilizing and mulching for type 1 10 sy, pavement removal 60 sy, pcc pavement patching, 8" thick (integral curb) 60 sy, 8" dense graded subbase, idot grad. No. 11 60 sy, subgrade stabilization material 10 cy.
