Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Holstein's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Public Works Director
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Holstein
Lease of approx 18. 77 acres of farmland.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
City of Holstein
Close: Jan 30, 2026
Lease of approx 18. 77 acres of farmland.
AvailableCity of Holstein
Submerged attached growth reactor (SAGR) and lagoon aeration system equipment. Furnishing all material, equipment, labor, and manufacturer's design for a new aerated lagoon system and SAGR. Includes, but is not limited to, all manufacturer provided equipment and materials including aeration system, SAGR system, blowers, blower controls, and all necessary manufacturer appurtenances. Section 2: sludge removal and general civil, architectural, structural, electrical, controls, process and other work, and construction per drawings and specifications. Furnishing all material, equipment, labor not included in section 1 for the SAGR and lagoon aeration system to become complete and fully operational. Includes, but is not limited to, SAGR structure, UV/blower structure, lift station building, lift station, electrical and controls improvements, miscellaneous concrete structures, splash pads, piping, valves, process piping, and all necessary appurtenances not included in section furnishing all material, equipment, labor necessary for the decommissioning of the existing lagoon cells, including but not limited to, structures, piping, valves and appurtenances, sludge removal and disposal, as indicated in the drawings and specifications. Work also includes grading, landscaping, controls, seeding, maintenance, and all other miscellaneous items to complete the work in accordance with drawings and specifications. Furnishing all material, equipment, labor necessary for removal and disposal of sludge from existing lagoon cells as indicated in the drawings and specifications. Allowance: lump sum allowance shall be included in the bid total for locating and furnishing top soil material in excess of what is available at the site and associated hauling costs.
Posted Date
Jun 27, 2025
Due Date
Jul 29, 2025
Release: Jun 27, 2025
City of Holstein
Close: Jul 29, 2025
Submerged attached growth reactor (SAGR) and lagoon aeration system equipment. Furnishing all material, equipment, labor, and manufacturer's design for a new aerated lagoon system and SAGR. Includes, but is not limited to, all manufacturer provided equipment and materials including aeration system, SAGR system, blowers, blower controls, and all necessary manufacturer appurtenances. Section 2: sludge removal and general civil, architectural, structural, electrical, controls, process and other work, and construction per drawings and specifications. Furnishing all material, equipment, labor not included in section 1 for the SAGR and lagoon aeration system to become complete and fully operational. Includes, but is not limited to, SAGR structure, UV/blower structure, lift station building, lift station, electrical and controls improvements, miscellaneous concrete structures, splash pads, piping, valves, process piping, and all necessary appurtenances not included in section furnishing all material, equipment, labor necessary for the decommissioning of the existing lagoon cells, including but not limited to, structures, piping, valves and appurtenances, sludge removal and disposal, as indicated in the drawings and specifications. Work also includes grading, landscaping, controls, seeding, maintenance, and all other miscellaneous items to complete the work in accordance with drawings and specifications. Furnishing all material, equipment, labor necessary for removal and disposal of sludge from existing lagoon cells as indicated in the drawings and specifications. Allowance: lump sum allowance shall be included in the bid total for locating and furnishing top soil material in excess of what is available at the site and associated hauling costs.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.