Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Avoid; the city resists sole source awards.
Coops: Use Sourcewell to buy off a cooperative contract; it’s the fastest approved path.
Entity: City of Hiawatha, IA
Stance: The city is highly averse to sole source contracting—deprioritize this path. Attempts are likely to fail and waste resources.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Hiawatha's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Finance Director
Assistant Building Official
City Engineer
Building Inspector 1
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Hiawatha
The project is approx. to provide decorative street lighting on Edgewood Road from Blairs Ferry Road to Emmons Street in Hiawatha, Iowa. This project aims to enhance the city's new street and trail project. The scope of work includes new electrical conduit, wiring, concrete bases, control cabinets and decorative poles.
Posted Date
Jan 21, 2026
Due Date
Feb 17, 2026
Release: Jan 21, 2026
City of Hiawatha
Close: Feb 17, 2026
The project is approx. to provide decorative street lighting on Edgewood Road from Blairs Ferry Road to Emmons Street in Hiawatha, Iowa. This project aims to enhance the city's new street and trail project. The scope of work includes new electrical conduit, wiring, concrete bases, control cabinets and decorative poles.
AvailableCity of Hiawatha
The extent of work on this project is the furnishing of all labor, equipment, and materials for the installation of approximately 401 trees, minimum 1” DBH, including watering for the minimum 1-year warranty period. The trees will be located throughout the City and work will occur during the 2025 Fall tree planting season. Site restoration will be required for any damage caused during the tree planting.
Posted Date
May 22, 2025
Due Date
Jun 24, 2025
Release: May 22, 2025
City of Hiawatha
Close: Jun 24, 2025
The extent of work on this project is the furnishing of all labor, equipment, and materials for the installation of approximately 401 trees, minimum 1” DBH, including watering for the minimum 1-year warranty period. The trees will be located throughout the City and work will occur during the 2025 Fall tree planting season. Site restoration will be required for any damage caused during the tree planting.
City of Hiawatha
Project will consist of reshaping existing eroded ravines, installing grid-tied concrete block matting and turf reinforcement matting for erosion protection, and excavating sediment deposit. The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements, which includes: clearing and grubbing, grading operations, installation of grid-tied concrete block mat & associated concrete anchor trench, installation of turf reinforcement mats, traffic signage and traffic control, seeding operations, erosion control practices, a construction access path, and construction survey. 1 LS clearing and grubbing; 207 CY topsoil, on-site; 151 CY topsoil, off-site; 517 CY excavation, class 13; 10 CY rubble removal (contingency item). See attached file.
Posted Date
Apr 16, 2025
Due Date
May 8, 2025
Release: Apr 16, 2025
City of Hiawatha
Close: May 8, 2025
Project will consist of reshaping existing eroded ravines, installing grid-tied concrete block matting and turf reinforcement matting for erosion protection, and excavating sediment deposit. The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements, which includes: clearing and grubbing, grading operations, installation of grid-tied concrete block mat & associated concrete anchor trench, installation of turf reinforcement mats, traffic signage and traffic control, seeding operations, erosion control practices, a construction access path, and construction survey. 1 LS clearing and grubbing; 207 CY topsoil, on-site; 151 CY topsoil, off-site; 517 CY excavation, class 13; 10 CY rubble removal (contingency item). See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.