Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Harrison
Work includes crush and shape of existing pavement on Byfield Drive with an approx total length of 5,800', 200 SY of removal of HMA driveway; 9,150 SY of HMA base crushing & shaping; 2,025 SY aggregate surface, 23A, 6"; 1,800 SF of 6" concrete driveway; 4,185 LF of pavement marking, road striping, waterborne, double- yellow, match ex; 2,100 SY of surface restoration. See attached file.
Posted Date
Jun 11, 2026
Due Date
Jul 6, 2026
Release: Jun 11, 2026
City of Harrison
Close: Jul 6, 2026
Work includes crush and shape of existing pavement on Byfield Drive with an approx total length of 5,800', 200 SY of removal of HMA driveway; 9,150 SY of HMA base crushing & shaping; 2,025 SY aggregate surface, 23A, 6"; 1,800 SF of 6" concrete driveway; 4,185 LF of pavement marking, road striping, waterborne, double- yellow, match ex; 2,100 SY of surface restoration. See attached file.
AvailableCity of Harrison
Site work, parking lot improvements, prefabricated restroom and restoration. Site utilities (including water, sewer, storm water management, and electric). Site amenities (including benches, signage, trash bins, shade sails and picnic tables). Concrete sidewalks including ADA compliant transitions and detectable warning surfaces. Earthwork and grading. Landscaping, planting, topsoil, seed and mulch. Parking lot improvements; Concrete barrier free parking spaces, parking striping and signage. Prefabricated Restroom; Approximately 864 sqft prefabricated seasonal restroom/concession facility with four restrooms, a storage/mechanical room, and concession area with ADA and barrier free compliance. See outside link.
Posted Date
-
Due Date
Jul 10, 2025
Release: -
City of Harrison
Close: Jul 10, 2025
Site work, parking lot improvements, prefabricated restroom and restoration. Site utilities (including water, sewer, storm water management, and electric). Site amenities (including benches, signage, trash bins, shade sails and picnic tables). Concrete sidewalks including ADA compliant transitions and detectable warning surfaces. Earthwork and grading. Landscaping, planting, topsoil, seed and mulch. Parking lot improvements; Concrete barrier free parking spaces, parking striping and signage. Prefabricated Restroom; Approximately 864 sqft prefabricated seasonal restroom/concession facility with four restrooms, a storage/mechanical room, and concession area with ADA and barrier free compliance. See outside link.
City of Harrison
The project involves asphalt paving, concrete curbs and gutters, stormwater management, and related site work.
Posted Date
Aug 29, 2024
Due Date
Oct 4, 2024
Release: Aug 29, 2024
City of Harrison
Close: Oct 4, 2024
The project involves asphalt paving, concrete curbs and gutters, stormwater management, and related site work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Sole Source: Not supported historically—deprioritize.
Coops: Lead with Sourcewell or MiDEAL; confirm your contract coverage and the City Manager’s piggyback process; have COIs ready ($3M GL, $1M Auto, $2M Umbrella).
Entity: City of Harrison, Michigan.
Evidence: No public records indicating use of sole source; treat as a low-probability path.
Board meetings and strategic plans from City of Harrison
The Master Plan for the City of Harrison is a comprehensive document adopted in November 2024, designed to guide the city's development over a 20-year term starting in 2025. It focuses on preserving the small-town and "Up North" character while addressing key land use issues. Strategic pillars include enhancing recreation, reducing blight, promoting downtown development, fostering economic growth, and expanding housing choices, supported by intergovernmental cooperation and zoning ordinance updates.
This document provides information regarding the City of Harrison's water system planning, specifically addressing the requirements of Michigan's updated Lead and Copper Rule. It details the necessity of replacing lead and galvanized service lines, the financial implications driving discussions on water rates, the city's progress through prior projects and grant applications, and outlines future long-term capital improvement initiatives to ensure system stability and compliance.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Harrison's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge