Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Farmer City
Mobilization, Traffic control, Pavement saw cutting and removal, Sewer flow control during all work, Removal of existing brick sanitary manhole and replacement with new PCC manhole, frame, and lid, Removal of existing 12” VCP sanitary sewer and replacement with 12” PVC SDR 26 sanitary sewer, Removal of existing 15” VCP sanitary sewer and replacement with 15” PVC SDR 26 sanitary sewer, Installation of bedding, initial backfill to 12” above top of replaced sewer pipe, and flowable backfill up to 12” from existing roadway surface, Installation and compaction of CA-6 aggregate roadway base for final 12” of depth.
Posted Date
Feb 4, 2026
Due Date
Feb 27, 2026
Release: Feb 4, 2026
City of Farmer City
Close: Feb 27, 2026
Mobilization, Traffic control, Pavement saw cutting and removal, Sewer flow control during all work, Removal of existing brick sanitary manhole and replacement with new PCC manhole, frame, and lid, Removal of existing 12” VCP sanitary sewer and replacement with 12” PVC SDR 26 sanitary sewer, Removal of existing 15” VCP sanitary sewer and replacement with 15” PVC SDR 26 sanitary sewer, Installation of bedding, initial backfill to 12” above top of replaced sewer pipe, and flowable backfill up to 12” from existing roadway surface, Installation and compaction of CA-6 aggregate roadway base for final 12” of depth.
City of Farmer City
Installation of approx 990 LF of 6" pvc water main; 45 LF of 4" pvc water main; 10 new water services from tap on the main to a new curb stop; installation of 8 new water services from the curb stop to the meter in the structure; abandonment of existing water main, pavement restoration; site restoration and cleanup.
Posted Date
Aug 22, 2025
Due Date
Sep 10, 2025
Release: Aug 22, 2025
City of Farmer City
Close: Sep 10, 2025
Installation of approx 990 LF of 6" pvc water main; 45 LF of 4" pvc water main; 10 new water services from tap on the main to a new curb stop; installation of 8 new water services from the curb stop to the meter in the structure; abandonment of existing water main, pavement restoration; site restoration and cleanup.
City of Farmer City
Construction of a new 220 gpm duplex submersible sanitary pump station with a stand-by diesel generator, including 737 LF of 6" PVC force main and 785 LF of 8" PVC sanitary sewer and ancillary manholes. The Project also includes construction of 1,600 LF of 8" SDR 21 PVC water main and associated valves and fittings. Also included is an extension of underground primary electrical service with transformers.
Posted Date
Aug 22, 2025
Due Date
Sep 26, 2025
Release: Aug 22, 2025
City of Farmer City
Close: Sep 26, 2025
Construction of a new 220 gpm duplex submersible sanitary pump station with a stand-by diesel generator, including 737 LF of 6" PVC force main and 785 LF of 8" PVC sanitary sewer and ancillary manholes. The Project also includes construction of 1,600 LF of 8" SDR 21 PVC water main and associated valves and fittings. Also included is an extension of underground primary electrical service with transformers.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track City of Farmer City's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Farmer City's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database