Summary
Mobilization, Traffic control, Pavement saw cutting and removal, Sewer flow control during all work, Removal of existing brick sanitary manhole and replacement with new PCC manhole, frame, and lid, Removal of existing 12” VCP sanitary sewer and replacement with 12” PVC SDR 26 sanitary sewer, Removal of existing 15” VCP sanitary sewer and replacement with 15” PVC SDR 26 sanitary sewer, Installation of bedding, initial backfill to 12” above top of replaced sewer pipe, and flowable backfill up to 12” from existing roadway surface, Installation and compaction of CA-6 aggregate roadway base for final 12” of depth.