Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of East Moline
The Illinois Department of Transportation is soliciting bids through Contract 028-85781 / Bulletin 029-66M85 (Federal Project VI5U(891)) for PCC full-depth roadway construction extending Bend Boulevard from 3rd Street to 7th Street within the City of East Moline, Rock Island County. The scope includes pavement removal, subgrade improvement, 8-inch PCC pavement with integral curb, storm sewers, water main, sanitary sewers, sidewalk, pavement markings, landscaping, and related items, with a project completion date of December 1, 2027. Sealed electronic bids via IDOT's EBids system will be opened at the July 31, 2026 letting at 12:00 PM CDT, with authorization to bid cut-off on July 28, 2026.
Posted Date
Jun 26, 2026
Due Date
Jul 31, 2026
Release: Jun 26, 2026
City of East Moline
Close: Jul 31, 2026
The Illinois Department of Transportation is soliciting bids through Contract 028-85781 / Bulletin 029-66M85 (Federal Project VI5U(891)) for PCC full-depth roadway construction extending Bend Boulevard from 3rd Street to 7th Street within the City of East Moline, Rock Island County. The scope includes pavement removal, subgrade improvement, 8-inch PCC pavement with integral curb, storm sewers, water main, sanitary sewers, sidewalk, pavement markings, landscaping, and related items, with a project completion date of December 1, 2027. Sealed electronic bids via IDOT's EBids system will be opened at the July 31, 2026 letting at 12:00 PM CDT, with authorization to bid cut-off on July 28, 2026.
AvailableCity of East Moline
Work consist of 569 CY of special excavation, 1515 CY of trench backfill, 2730 LF of water main, 8" PVC, 2620 lf of water service piping, 57 EA of curb stop & box, 57 EA of water service tap & corp stop, 57 EA of curb stop & box removal, 3 EA of fire hydrant assembly w/ 6" tee & valve, 3 EA of fire hydrant assembly removal, 4 EA of water main valve abandonment, 1476 lf of 12" storm sewer pipe, 158 LF of 12" storm sewer, water main quality pipe, 18 EA of storm sewer drain basin,5 EA of storm sewer inlet remova, 620 SY of 7" PCC pavement patching, 969 SY of 6" hma pavement patching, 810 tn of HMA overay. See attached file.
Posted Date
Apr 9, 2026
Due Date
Apr 28, 2026
Release: Apr 9, 2026
City of East Moline
Close: Apr 28, 2026
Work consist of 569 CY of special excavation, 1515 CY of trench backfill, 2730 LF of water main, 8" PVC, 2620 lf of water service piping, 57 EA of curb stop & box, 57 EA of water service tap & corp stop, 57 EA of curb stop & box removal, 3 EA of fire hydrant assembly w/ 6" tee & valve, 3 EA of fire hydrant assembly removal, 4 EA of water main valve abandonment, 1476 lf of 12" storm sewer pipe, 158 LF of 12" storm sewer, water main quality pipe, 18 EA of storm sewer drain basin,5 EA of storm sewer inlet remova, 620 SY of 7" PCC pavement patching, 969 SY of 6" hma pavement patching, 810 tn of HMA overay. See attached file.
City of East Moline
Sale of surplus real estate, residential lots, for the purpose of constructing single-family homes. Included in the listing is a non-developable lot.
Posted Date
Apr 7, 2026
Due Date
May 4, 2026
Release: Apr 7, 2026
City of East Moline
Close: May 4, 2026
Sale of surplus real estate, residential lots, for the purpose of constructing single-family homes. Included in the listing is a non-developable lot.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If the need is critical to operations/continuity (public works/utility), build a justification with the end-user and route for City Council approval.
Coops: Start with Sourcewell or OMNIA Partners; confirm eligibility with Finance and the end-user; use the pre-competed contract to fast-track.
City of East Moline, IL. Use when the solution is specialized for public works/utility and essential for operational necessity or continuity of service. Work directly with the end-user department to draft the justification and prepare the packet for City Council approval.
Board meetings and strategic plans from City of East Moline
The meeting focused on the implementation of the Babcock-Meersman Neighborhood Well-to-Water Hook on Initiative. This program aims to transition remaining properties in the subdivision from private well systems to the municipal water supply, which was originally installed in 2010. The plan includes the waiver of standard connection fees, coordination of installation assistance for property owners, and the provision of a zero-interest, five-year utility bill financing option to mitigate financial hardship. The initiative seeks to ensure consistent municipal utility standards, enhance public health, and improve fire protection capabilities throughout the neighborhood.
The meeting focused on two primary agenda items. First, the approval of an amendment to employee death benefits by funding the life insurance policy through a 115 trust, which is expected to save the Health Fund approximately $2,500 annually. Second, the council approved a professional services agreement with CMT for the clearwell replacement and water treatment plant capital improvement project. This approval includes the engineering design and permitting phase of the project with a budget of $1,875,000.
The City Council meeting addressed several water treatment infrastructure projects and emergency repairs. Key discussions included the Babcock-Meersman Neighborhood Well-to-Water Hook-on Initiative, the final design of the interim orthophosphate feed system, the rehabilitation of Raw Water Pump No. 1, and the replacement of High Service Motor No. 1. The Council also reviewed financial reports, approved budget adjustments, and discussed emergency repairs performed on additional water filtration plant equipment to maintain operational capacity. Furthermore, the meeting involved organizational and administrative updates, including department reports from the City Administrator and various directors.
The board meeting agenda includes guest presentations regarding a Halloween event and a 250th anniversary celebration. Administrative items feature the President's report on consistent meetings for park development. Old business includes discussions on mowing the legion sign area. New business covers documentation reviews, sand replacement at Garfield Park, clarification of the official name for Los Amigos Park, updates for park signage, and the implementation of a virtual or paper-based park issue response form.
The meeting addressed various operational and infrastructure projects. Key actions included the approval of maintenance work for the Low Voltage Switchgear at the Water Treatment Plant, the discussion of a potential Multi-use path along the Sugar Creek Levee, and the authorization of a new ordinance to standardize the siting process for pollution control facilities. Additionally, the Council set a public hearing date for the East Moline Connector TIF District, approved a contract for lead communication services, and authorized rehabilitation work for a high service pump at the Water Treatment Plant.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of East Moline's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge