Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Dundas
The City of Dundas seeks bids for Schilling Drive sanitary sewer repairs, including pavement removal and replacement, curb and gutter work, excavation, asphalt paving, and installation of new PVC sanitary sewer and RCP storm sewer. Bids are to be submitted electronically via QuestCDN and the project is subject to Minnesota Statute 16C.285 regarding responsible contractors. The solicitation is an Invitation for Bid with a public online bid opening via Zoom scheduled for May 5, 2026.
Posted Date
Apr 9, 2026
Due Date
May 5, 2026
Release: Apr 9, 2026
City of Dundas
Close: May 5, 2026
The City of Dundas seeks bids for Schilling Drive sanitary sewer repairs, including pavement removal and replacement, curb and gutter work, excavation, asphalt paving, and installation of new PVC sanitary sewer and RCP storm sewer. Bids are to be submitted electronically via QuestCDN and the project is subject to Minnesota Statute 16C.285 regarding responsible contractors. The solicitation is an Invitation for Bid with a public online bid opening via Zoom scheduled for May 5, 2026.
AvailableCity of Dundas
Work includes approx 268 SY remove bituminous pavement; 416 LF remove and replace concrete curb and gutter; 806 CY excavation - common (p); 2236 CY common embankment (CY); 392 CY aggregate base (CY) class 6; 161 ton type sp 9. 5 wearing course mix (2,c); 71 tn type sp 12.5 wearing course mix (4,f); 40 SF modular block retaining wall; 374 LF 18" - 30" rcp storm sewer; 27 LF 48" - 72" rcp drainage structure; 6920 sf 6" concrete walk; 1387 sf 6" concrete curb ramp walk; 450 LF concrete curb and gutter; 1 system revise signal system; 164 LF 24" solid line pref thermo gr in; 840 SF crosswalk pref thermo gr in; 9.8 LF const drainage structure.
Posted Date
Jun 4, 2025
Due Date
Jul 1, 2025
Release: Jun 4, 2025
City of Dundas
Close: Jul 1, 2025
Work includes approx 268 SY remove bituminous pavement; 416 LF remove and replace concrete curb and gutter; 806 CY excavation - common (p); 2236 CY common embankment (CY); 392 CY aggregate base (CY) class 6; 161 ton type sp 9. 5 wearing course mix (2,c); 71 tn type sp 12.5 wearing course mix (4,f); 40 SF modular block retaining wall; 374 LF 18" - 30" rcp storm sewer; 27 LF 48" - 72" rcp drainage structure; 6920 sf 6" concrete walk; 1387 sf 6" concrete curb ramp walk; 450 LF concrete curb and gutter; 1 system revise signal system; 164 LF 24" solid line pref thermo gr in; 840 SF crosswalk pref thermo gr in; 9.8 LF const drainage structure.
City of Dundas
150 SY - remove & replace bituminous pavement, 1 each - remove and replace pedestrian ramp, 150 CY - rock excavation, 40 LF salvage and reinstall storm sewer, 900 LF 8" watermain ductile iron pipe CL 52; 70 ton - aggregate base class 5, 2 ea hydrant, 1 ea 12"x8" wet tap, 3 ea 6" gate valve & box, 0.74 acre - boulevard restoration.
Posted Date
Mar 19, 2025
Due Date
Apr 8, 2025
Release: Mar 19, 2025
City of Dundas
Close: Apr 8, 2025
150 SY - remove & replace bituminous pavement, 1 each - remove and replace pedestrian ramp, 150 CY - rock excavation, 40 LF salvage and reinstall storm sewer, 900 LF 8" watermain ductile iron pipe CL 52; 70 ton - aggregate base class 5, 2 ea hydrant, 1 ea 12"x8" wet tap, 3 ea 6" gate valve & box, 0.74 acre - boulevard restoration.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from City of Dundas
The Economic Development Authority discussed a proposal from Rebound Partners for the North Railway Street Project, which includes a four-story, 116-unit apartment building with ground-floor commercial space. The Authority moved to authorize staff to prepare for the potential sale of the property to facilitate this development.
The council discussed various administrative and developmental topics. Key items included a proposal for tax abatement for the Stoneridge Hills 2nd Addition project and the authorization for advertising bids for the Schilling Drive Sanitary Sewer Repairs. Additionally, the council addressed an annexation response to Bridgewater Township, considered a retail registration application for low-potency hemp edibles, and reviewed disbursement reports. Public works updates provided information on transportation planning, sidewalk improvements, and upcoming street maintenance projects.
The agenda for the Regular Meeting included several items for consideration. Key topics involved the potential appointment of a Bridgewater Township Representative to the Dundas Planning Commission to fill a vacancy required by the Orderly Annexation Agreement. The consent agenda covered the approval of the February 23, 2026, Regular Minutes, acceptance of a $100 donation from Judy's Floral Design, and review of disbursements totaling $131,450.22. Reports were scheduled from the City Engineer, City Administrator/Clerk, and Mayor/Councilors. The Council also announced upcoming meeting dates and community events.
The key discussion points included the review of the draft Request for Proposal (RFQ) for the playground equipment at Tower Park. The Board members discussed the timeline, noting that site work must precede equipment installation, and directed staff to update residents regarding the timeline. Planning was also finalized for the 2026 Easter Egg Hunt, scheduled for Saturday, April 4, with egg stuffing set for March 21 at City Hall.
The agenda for the meeting includes standard items such as roll call and approval of the agenda and minutes, followed by review of bills, communications, and reports. The primary business items involve Unfinished Business and New Business. Specifically, the New Business section mandates consideration of the Rebound Partners -- Proposed North Railway Street Project. The document also contains minutes from a previous meeting where the 2026 Final Economic Development Authority Budget and 2026 Final Property Tax Levy were considered for approval. Furthermore, supporting documentation outlines the details of the proposed North Railway Street Project, a multi-family housing development involving six parcels, including one owned by the EDA, and discusses potential Tax Increment Financing (TIF) assistance.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Dundas's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database