Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Copperhill
Design, fabrication, and installation of an approximately six (6) foot bronze miner memorial statue to commemorate the community's heritage and the america 250 celebration. Project includes design, casting, base construction, and installation. The statue will be mounted to a concrete foundation and should be designed to allow for future relocation if needed.
Posted Date
Mar 19, 2026
Due Date
Apr 20, 2026
Release: Mar 19, 2026
City of Copperhill
Close: Apr 20, 2026
Design, fabrication, and installation of an approximately six (6) foot bronze miner memorial statue to commemorate the community's heritage and the america 250 celebration. Project includes design, casting, base construction, and installation. The statue will be mounted to a concrete foundation and should be designed to allow for future relocation if needed.
AvailableCity of Copperhill
Pump station improvements. Contract no. 1 consists of making upgrades to the existing fightingtown pump station. Major work items include: replacing the two existing dry pit submersible sewage pumps with new pumps; replacing the existing 8"-diameter plug valves (2 per pump) and check valve (1 per pump) with new valves; replacing 8"-diameter header piping and fittings; replacing the existing 8"-diameter 90-degree ductile iron bend exiting the dry pit station with a new 8"-diameter ductile iron tee; installing a new 8"-diameter vertical pipe and associated appurtenances to just above the top slab of the station to provide a connection for future temporary bypass pumping; replacing the existing muffin monster installed in the inlet channel to the wetwell with a new unit; temporary bypass pumping; upgrades to the pump controls and vfds; and miscellaneous electrical improvements. Contract No. 2 consists of trenchless rehabilitation of existing sewer infrastructure and the removal and replacement of existing sewer infrastructure.
Posted Date
Jul 9, 2025
Due Date
Aug 7, 2025
Release: Jul 9, 2025
City of Copperhill
Close: Aug 7, 2025
Pump station improvements. Contract no. 1 consists of making upgrades to the existing fightingtown pump station. Major work items include: replacing the two existing dry pit submersible sewage pumps with new pumps; replacing the existing 8"-diameter plug valves (2 per pump) and check valve (1 per pump) with new valves; replacing 8"-diameter header piping and fittings; replacing the existing 8"-diameter 90-degree ductile iron bend exiting the dry pit station with a new 8"-diameter ductile iron tee; installing a new 8"-diameter vertical pipe and associated appurtenances to just above the top slab of the station to provide a connection for future temporary bypass pumping; replacing the existing muffin monster installed in the inlet channel to the wetwell with a new unit; temporary bypass pumping; upgrades to the pump controls and vfds; and miscellaneous electrical improvements. Contract No. 2 consists of trenchless rehabilitation of existing sewer infrastructure and the removal and replacement of existing sewer infrastructure.
City of Copperhill
Contract no. 2 consists of trenchless rehabilitation of existing sewer infrastructure and the removal and replacement of existing sewer infrastructure. Trenchless rehabilitation includes the following: subsurface rehabilitation in existing manholes, installation of full-depth polymer wall liner within existing manholes, sealing of existing gravity sewer with chemical insertion grouting, and insertion of cured-in-place pipe within existing 18-inch, 15-inch, 12-inch, 10-inch, and 8-inch gravity sewers. Removal and replacement includes the following: removal and replacement of existing precast and brick sewer manholes and 8-inch vitrified clay pipe gravity sewers. See attached file for full scope.
Posted Date
Jun 12, 2025
Due Date
Jul 17, 2025
Release: Jun 12, 2025
City of Copperhill
Close: Jul 17, 2025
Contract no. 2 consists of trenchless rehabilitation of existing sewer infrastructure and the removal and replacement of existing sewer infrastructure. Trenchless rehabilitation includes the following: subsurface rehabilitation in existing manholes, installation of full-depth polymer wall liner within existing manholes, sealing of existing gravity sewer with chemical insertion grouting, and insertion of cured-in-place pipe within existing 18-inch, 15-inch, 12-inch, 10-inch, and 8-inch gravity sewers. Removal and replacement includes the following: removal and replacement of existing precast and brick sewer manholes and 8-inch vitrified clay pipe gravity sewers. See attached file for full scope.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from City of Copperhill
This document outlines the management plan for Springfield Township's Parks and Recreation, serving as a roadmap for its long-term direction and goals. Key focus areas include establishing parks as community destinations, connecting the community through greenways and trails, facilitating recreation opportunities for active healthy living, and ensuring fiscal responsibility and financial sustainability. The plan details management strategies for specific parks and greenspaces, outlines plans for trails, and describes various community programs and fiscal management principles to achieve these objectives.
The Springfield Township Parks and Recreation Plan serves as a comprehensive guide for establishing and developing the community's parks and recreation system from 2013 to 2022. Its core purpose is to balance the conservation of the Township's scenic rural character and natural resources with providing opportunities for active living and community engagement. The plan outlines four strategic goals: establishing parks and recreation facilities as community destinations, connecting the community through a system of greenways and trails, facilitating recreation opportunities for active healthy living, and ensuring operational excellence and financial sustainability. The overarching vision is to enrich the community through natural resource conservation, active lifestyles, and the preservation of rural character.
This Open Space Plan Update for Springfield Township outlines strategies for the preservation of open space and farmland through acquisition and regulation. The plan prioritizes protecting significant natural resources, including floodplains, woodlands, wetlands, and water bodies, with a particular emphasis on the Cooks Creek Watershed. It also focuses on maintaining scenic views and vistas, and developing greenways and linkages for wildlife corridors. The overarching vision is to preserve the Township's rural character and ensure sustainable land use.
The Springfield Township Parks and Land Management Plan serves as a comprehensive guide for the management and development of the township's parks, greenspaces, and trails. Building upon the 2012 Parks and Recreation Master Plan, it outlines strategic goals focused on establishing community destinations, connecting the community through greenways and trails, facilitating recreation opportunities, and ensuring operational excellence and financial sustainability. The plan details the management of specific assets such as Peppermint Park, Lime Kiln, Flagpole Memorial Garden, and the Upper Bucks Rail Trail, alongside various community programs and guidelines for fiscal responsibility and permitted uses.
The Planning Commission held a public meeting to discuss the Proposed 2024 Springfield Township Comprehensive Plan, with a presentation summarizing its purpose and goals. Topics discussed included Agriculture District lot sizes, zoning ordinances for new residents, and the Comprehensive Plan's directives. Concerns were raised about the extension of public sewer and water, the Land Use Map, preserved land, assessment timelines, and water testing.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Copperhill's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database