8" Supply Waterline Project RFP
Posted
Nov 12, 2026
Dec 16, 2026
Installation of approx 16 miles of 8” pvc supply waterline including but not limited to piping, tracer wire with test stations, valves, flush assemblies, fire hydrants, air release valves, county road cased/uncased crossings, named/unnamed tributary uncased/cased crossings, utility cased crossings, unclassified uncased crossings, casing pipe, carrier pipe, connections to existing mains along with the construction of a booster pump station facility with ancillary equipment, master meter vault, pressure sustaining valve vault and all associated appurtenances to complete the project.