2026 Waterline Replacement Project RFP
2026 Waterline Replacement Project.
Description: Installation of approx 16 miles of 8” pvc supply waterline including but not limited to piping, tracer wire with test stations, valves, flush assemblies, fire hydrants, air release valves, county road cased/uncased crossings, named/unnamed tributary uncased/cased crossings, utility cased crossings, unclassified uncased crossings, casing pipe, carrier pipe, connections to existing mains along with the construction of a booster pump station facility with ancillary equipment, master meter vault, pressure sustaining valve vault and all associated appurtenances to complete the project.
City · KS, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Caney.
Adjacent opportunities open for bidding right now.
Posted
Nov 11, 2026
Dec 1, 2026
2026 Waterline Replacement Project.
Windber Area (Water And Sewer) Authority
Special DistrictPA
Posted
Oct 23, 2026
Nov 24, 2026
Work includes approx 8,068 LF of 6" distribution waterline; 1,554 LF of 12" distribution waterline, together with all necessary appurtenances; a precast concrete meter vault (manhole), and associated piping; customer service connections; water service lines from the water main to the property line; water service lines from the water main in select areas on private property within WAA rights-of-way; municipal roadway restoration, and all related work.
Regina Mutual Domestic Water Consumers Assoc.
Special DistrictNM
Posted
Jul 13, 2026
Dec 18, 2026
Work includes approx 13,800 LF of 6" C900 PVC waterline including gate valves, fire hydrants, and appurtenances.
Birch River Public Service District
Special DistrictWV
Posted
-
Jan 12, 2027
Contract No. 1 – Furnishing all materials, labor, and necessary items for the construction and installation of approximately 15,700 LF of 6-inch PVC waterline, 7,500 LF of 4-inch PVC waterline, 30 new water service connections with meter settings and pressure reducing valves, 15 fire hydrants, gate valves, and all related appurtenances as outlined in the plans and specifications. The project also includes installation of a potable water storage tank mixing system, and other necessary work for a complete and operational water distribution system.