Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Chelmsford Water District
Project involves furnishing and installing approx. 3,700 feet of 8" ductile iron (DI) water main, installing approx 40 water services. Water service by-pass piping will also be required. The work will also include furnishing and installing approx. 1,100 feet of 10" DI transmission main and approx 7,600 LF of 10" high-density polyethylene transmission main.
Posted Date
Feb 11, 2026
Due Date
Mar 11, 2026
Release: Feb 11, 2026
Chelmsford Water District
Close: Mar 11, 2026
Project involves furnishing and installing approx. 3,700 feet of 8" ductile iron (DI) water main, installing approx 40 water services. Water service by-pass piping will also be required. The work will also include furnishing and installing approx. 1,100 feet of 10" DI transmission main and approx 7,600 LF of 10" high-density polyethylene transmission main.
AvailableChelmsford Water District
Work includes constructing a new treatment process for the removal of pfas at the riverneck water treatment plant. The treatment process will be housed in a separate masonry building and consist of six pressurized 12-foot diameter vessels filled with granular activated carbon (gac). The building will be approx. 132 by 57' with the main process floor depressed 4' below ground elevation. The new building will contain a two-celled concrete backwash supply tank with vertical turbine pumps, an electrical room, and a mechanical room. Work will also include various upgrades to the riverneck wtp main building. Sub-bids for masonry work, miscellaneous and ornamental iron, roofing and flashing, painting, plumbing hvac, and electrical work.
Posted Date
Jan 7, 2026
Due Date
Feb 26, 2026
Release: Jan 7, 2026
Chelmsford Water District
Close: Feb 26, 2026
Work includes constructing a new treatment process for the removal of pfas at the riverneck water treatment plant. The treatment process will be housed in a separate masonry building and consist of six pressurized 12-foot diameter vessels filled with granular activated carbon (gac). The building will be approx. 132 by 57' with the main process floor depressed 4' below ground elevation. The new building will contain a two-celled concrete backwash supply tank with vertical turbine pumps, an electrical room, and a mechanical room. Work will also include various upgrades to the riverneck wtp main building. Sub-bids for masonry work, miscellaneous and ornamental iron, roofing and flashing, painting, plumbing hvac, and electrical work.
AvailableChelmsford Water District
Qualified contractors to submit a Statement of Qualifications (SOQ) for the Water Treatment Plant Improvements project. The project involves constructing a new treatment process for the removal of PFAS at the Water Treatment Plant.
Posted Date
Oct 22, 2025
Due Date
Nov 12, 2025
Release: Oct 22, 2025
Chelmsford Water District
Close: Nov 12, 2025
Qualified contractors to submit a Statement of Qualifications (SOQ) for the Water Treatment Plant Improvements project. The project involves constructing a new treatment process for the removal of PFAS at the Water Treatment Plant.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Chelmsford Water District
The agenda for the meeting included opening procedures with the Pledge of Allegiance, followed by a Roll-call vote to enter into Executive Session to discuss the purchase, exchange, sale, lease or value of real property as it may detrimentally affect the negotiating position of the public body. Open Sessions covered a PFAS Project Update, including reports from AECOM and ResilientCE, and reports from the Business Director/Treasurer and the Superintendent. Old Business and New Business sections were included, along with pending action items regarding property review, land acquisition funding, and review of bylaws and future properties.
The meeting commenced with an Executive Session concerning the purchase of real property. In Open Session, a detailed progress report on the PFAS Treatment Project was provided, covering Contract 1 (Crooked Spring Facility), Contract 2 (Riverneck Facility), Contract 3 (Water Transmission Main), and the State Revolving Fund (SRF) Program status. AECOM noted the need for an SRF refundable addendum for construction engineering services. The Business Director/Treasurer's report included updates on the FY2025 Audit expectations, the Watershed Lane Culvert funding requiring a potential warrant article increase, the delay of the 20 Watershed Lane Building Project, receipt of an accelerated payment for the PFAS Class Action Lawsuit, a banking portfolio review, personnel updates, and progress on FY2027 budget reviews. The Superintendent's report highlighted distribution and meter maintenance, water quality sampling, GIS/Environmental Compliance including recent PFAS results which exceeded quarterly limits, and planning board feedback regarding the Riverneck Water Treatment Plant addition. Discussions also touched upon water rates, with no increase recommended, and the need to schedule land acquisition funding and budget work sessions.
The Commissioners' Meeting included an update on the PFAS Treatment Project, detailing progress on Contract 1 (Crooked Spring Facility), design and scheduling for Contract 2 (Riverneck Facility) and Contract 3 (Water Transmission Main), and the submission of SRF Request #4. AECOM is scheduled to submit design for the Riverneck PFAS project to the Planning Board. The Business Director's Report covered FY25 vs FY26 financial snapshots, updates on the FY2025 Audit, status of 2025 liens, and significant discussion regarding the Watershed Lane Culvert Grant, where consensus favored walking away from the grant under current terms pending further communication with MEMA. The report also addressed the outstanding DISH rent payment and the receipt of an accelerated payment contract for the 3M PFAS class action lawsuit. New business included the hiring of a new Accountant--Benefits Coordinator effective January 20, 2026, notification of an employee's deployment for military service, submission of public records information, and a response sent regarding an Inspector General inquiry about budgeted salaries. The Superintendent's Report provided updates on infrastructure, including main breaks, meter changes, filter media replacement, generator servicing, and PFAS testing results from November 2025. The CSWTP project is progressing, and the Evergreen Road project is complete.
The meeting included a presentation by CBIZ CPA's regarding the draft Financial Statements for the Year Ended June 30, 2025, noting that finalization is pending information from the PFAS Attorney concerning settlement funds. A major focus was the PFAS Project Update, detailing progress on Contract 1 (Crooked Spring Treatment Facility) with a confirmed completion date of June 28, 2027, updates on Contract 2 (Riverneck Treatment Facility) planning, Contract 3 (Water Transmission Main) design, and the submission of SRF Request #3. Discussion also covered revisions to the easement for the Water Transmission Main project and avoiding additional costs. The Commissioners signed the Linwood Street water main contract. The Superintendent's Report covered operational items including main breaks, service leaks, hydrant winterization, PFAS testing results (RNWTP=17.2; CSWTP=28.9), solar production, and the sale of an old emergency truck. The Board agreed on the benefit of planning for future land acquisitions for well protection.
The meeting included updates on the PFAS project, covering the Crooked Spring and Riverneck PFAS Treatment Facilities, as well as the Water Transmission Main. The Business Director/Treasurer provided a report including financial updates, PFAS notifications, and information on a PFAS class action lawsuit. The Superintendent reported on distribution, meter maintenance, treatment updates, GIS/Environmental Compliance, and the Linwood Road Water Main Extension project. Discussions also covered the Canal Street culvert, office addition plans, and the removal of a dying oak tree on Warren Ave. The status of 223 Riverneck Rd, plans to address water main dead ends, and deep well exploration at Misty Meadows were also discussed.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Chelmsford Water District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Chelmsford Water District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database