Retrieving RFP details
Release
Close
Chelmsford Water District
Qualified contractors to submit a Statement of Qualifications (SOQ) for the Water Treatment Plant Improvements project. The project involves constructing a new treatment process for the removal of PFAS at the Water Treatment Plant.
CWD-RiverneckWTP-Prequal-RFQ-Ad
docx
City of Chandler
Work will consist of thru lanes, turn lanes, bike lanes, sidewalks, curbs and gutters, street lighting, Intelligent Transportation System (ITS), traffic signals as warranted, storm drainage, landscaping, right-of-way acquisition, and utility relocation. The scope of work is to provide services including data collection, utility coordination, facilitate progress meetings, project management, survey, cost estimates, conceptual pre-design, project assessment reports, public and stakeholder meetings, right of way coordination, water/sewer utility upgrades, geotechnical services, environmental services, permitted plans including phasing plans, specifications, bid schedule with a final cost estimate, and bidding assistance.
City of Bellingham
Provide professional surveying and mapping services to the engineering division of the public works department.
Emmetsburg Municipal Utilities Board
Emmetsburg Municipal Utilities (EMU) will be publishing a request for statements of qualifications (RFQs) for Construction Manager at Risk (CMAR) services to provide Construction services for Water Treatment Facility Improvements. The Project will consist of improvements to the existing Water Treatment Facility consisting of: Existing pressure filter rehabilitation; Cast in place concrete storage tanks; Precast concrete building; Reverse osmosis (RO) equipment; Site work; Process pumps, piping, and electrical; Backwash waste tank conversion into a lift station and forcemain; New supply well with submersible pump.
Release
Oct 22, 2025
Close
Nov 12, 2025