Solar Panel Replacement - RE-BID
Posted
Nov 18, 2026
Dec 16, 2026
Work consists of repairing one PV structure (SSS-44) in Parking Lot 18 west, which was damaged during a windstorm. Two (2) of the four (4) footing/column/beam assemblies of the array will be reused and two (2) will be abandoned/removed with three new assemblies. All purlins and solar panels are being removed and replaced with same type of purlins and solar panels as originally installed. All inverters and associated equipment to be reused. Solar panels provided by owner. All concrete and asphalt damaged or removed during construction to be restored to match existing. All waste to be disposed of by contractor. The panels in the scope of work are LG Neon 2 405W Model LG405N2W-V5 with a standard string inverter (carport). The project must also comply with AQMD rule 403 (dust control). OWNER shall award the contract for the Project to the lowest responsible Bidder submitting a responsive bid as determined by the OWNER from the BASEBID ALONE. OWNER reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.




